Toll Free 1-888-658-1658 sales@out doorlivingtoday.com
Page 8
12.
Position and attach U Shingle (5” wide) on Roof Panel with 3 - 7/8” Shingle Nails. See
above for details.
U
Align U Shingle tight
against Roof Shingle.
U
V
Secure with 3 - 7/8”
Shingle Nails
Flush with other
Roof Shingles.
21.
Place and attach V Shingle (6” wide) directly on top of Shingle U. Shingle V will slide under 2nd row
Shingle. Secure with 3 - 7/8” Shingle nails at least 9” from Butt. Place and att ach a second U Shingle (5”
wide) in line with 2nd row of shingles. Secure with 3 - 7/8” Shingle nails at least 9” from Butt.
Thick End
5” wide
6”
wide
V
Thick End
U
5” wide
Secure with 3 - 7/8”
Shingle Nails
2nd
Row
Shingle
W
6” wide
24.
To finish side, place and attach W Shingle (6” wide x 8.5” long) in line with 3rd and final row of
shingles. Shingle W will partially cover Shingle U. Secure with 2 - 7/8” Shingle nails 2”- 3” from top.
(Nails will be covered by Ridge Cap - X). Complete att achment of Shingles on opposite Roof Panel Side
following
Steps ???
.