Toll Free 1-888-658-1658 sales@out doorlivingtoday.com
Page 7
9.
Locate
Door Header (E)
and place between Side Wall framing with dado cut facing down and to
the front.
Door
Header (E)
Dado cut to
front, facing
down.
Aligned flush at
front and top
10.
Prior to
attaching Door
Header, drill 2
pilot holes with
1/8” drill bit
through Side Walls
and into the end of
Header. Have
your helper hold
Header and Wall
steady. Secure
with 2 - 2 1/2”
screws per side.
You will want
Front Corner Trim (P)
to cover
screws in
Step 24
. Use Trim to confirm screw
location.
11.
Lay
Roof Panel (F)
on flat level ground. Note, overhanging Out side Shingles have been removed to
avoid shipping damage and will need to be inst alled now. Locate
U ,V & W Shingles
. There are 4 -
5” wide x 16” long
U
Shingles, 2 - 6” wide x 16” long
V
Shingles and 2 - 6” wide x 8.5” long
W
Shingles.
Align Roof Panel so thick end of
Shingle (butt end) is facing front.
Extra Shingles are included.
U
V
U
W
U
V
U
W