2.
When correctly positioned, attach each Joist with 4 - 2 1/2” screws (2 per end).
You can find the
Square Drive Screw Bit in the Hardware Kit Bag.
3.
Lay out
Floor Joist Frames
as illustrated.
There are 3 larger and 3 smaller Frame Sections.
The Footprint for the floor when attached together
will be 136 1/2” wide x 96” deep.
5.
Complete all large and small frame
attachments. Screw each completed section
together with
8 - 2 1/2” Screws
.
Front of Shed
You can find the
Square Drive Bit for
the screws in with the
Hardware Kit Bag.
4.
Attach each large and small floor joist
frame together with
6 - 2 1/2” Screws
per
section.
96”
136 1/2”
6.
When completed, your floor footprint
should be 136 1/2” wide x 96” deep.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 8