OLT 12'x8' Garden In A Box Assembly Manual Download Page 3

Selecting A Location - Garden Setting Or Patio 

Walk around your property and make notes of the following: 

- Sunny spots. 
- Slope of the land. 
- Light blocking trees and high buildings. 

 
Don’t hide your Garden away in a dark corner. 
 
Ensure you have easy access to it. 
 
Place your Garden on a level piece of land with good 
drainage. Take into account existing paths and utilities such 
as electricity and water. 
 
Having a water supply at hand avoids carrying heavy 
watering cans from the tap to the garden bed. 

 
Preparing The Ground For A Garden Setting

 

Level ground beneath the raised bed prior to assembly. 
Your new Garden will be open on the bottom 
which enables plant roots to access soil nutrients below 
ground level. If there are gophers or moles in the garden 
area, lay hardware cloth, rocks or bricks (not included) on the floor of the unit, before adding soil. 
 
Lay down a sand perimeter base for the Garden Frames to sit on if possible. Sand offers excellent 
drainage and will make it easier to level bed frames. 

 

The Garden can also be located on almost any flat surface - sand, pebbles/gravel, concrete or asphalt. 
Preparing the soil and the sand base beneath the Garden will not be necessary.  Consider lining the 
Garden with landscape fabric to prevent soil from seeping out. Twenty inches of soil should be plenty for 
most types of vegetables and flowers. Please check growing instructions for root depths prior to 
planting. 
 

Once The Garden Is Assembled - Add Soil

 

Use a quality soil ideal for growing vegetables, for the top 12 inches (approximately 3 cubic yards or 
28 - 32 wheelbarrows).  Any soil is suitable for the bottom 8 inches (approximately 1.5 cubic yards). Or, you 
may fill the bottom 8 inches with gravel, pebbles, rocks or wood chips. 
Most 1/2 ton pickup trucks can haul 1 cubic yard of top soil if this is an option for you. Consider having soil 
delivered as opposed the buying bags by the cubic foot. There are 27 cubic feet in 1 cubic yard. 
 
Fill the Garden to the top of the wood framing (the start of the metal screening). In a few weeks, the soil 
will settle/drop about 4-6 inches. Top up if necessary. 
 
Add soil within two weeks of planting. Fertilizer may be required. Check with your local garden growing 
expert before adding any fertilizer! 
 

Arranging & Planting Crops

 

Since requirements vary from region to region on how to arrange and plant crops, we recommend 
researching thoroughly before planting.

Important Information For Homeowner

Toll Free 1-888-658-1658            www.outdoorlivingtoday.com            [email protected]

Page 3

141”

92”

        8

3

22 3/4”

46”

35 1/8”

Diagonal inside 
measurement  
is 164 7/32”.

Front

22 3/4”

46”

Summary of Contents for 12'x8' Garden In A Box

Page 1: ...TENTS 7 424 787 7 490 435 In the event of a missing or broken piece simply call the Outdoor Living Today Customer Support Line 1 888 658 1658 within 30 days of the delivery of your purchase It is our commitment to you to courier replacement parts free of charge within 10 business days of this notification Replacement parts will not be provided free of charge after the 30 day grace period Outdoor L...

Page 2: ...F D3 D1 D1 D2 D3 D4 D4 F Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 2 Panel Section Part A 9 Side Rear Panels 46 wide x 33 1 2 high Part C 2 Door Panels 22 3 4 wide x 31 1 2 high Part D1 2 Interior Panels Rear 41 1 2 wide x 21 high Part D2 2 Interior Panels Sides 32 1 8 wide x 21 high Part D3 2 Interior Panels Front 26 3 8 wide x 21 high Part D4 2 Interio...

Page 3: ... Garden with landscape fabric to prevent soil from seeping out Twenty inches of soil should be plenty for most types of vegetables and flowers Please check growing instructions for root depths prior to planting Once The Garden Is Assembled Add Soil Use a quality soil ideal for growing vegetables for the top 12 inches approximately 3 cubic yards or 28 32 wheelbarrows Any soil is suitable for the bo...

Page 4: ... 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 4 1 Orientate Side Rear Panels and Door Panels as illustrated their Screens positioned to the inside Parts Steps 1 8 A Side Rear Panels 46 x 33 1 2 x 9 C Door Panels 22 3 4 x 31 1 2 x 2 Hardware Steps 1 2 S1 2 1 2 Screws x 1 total 2 Starting in rear corner position Side Rear Panels together so framing is flush at top and sides When...

Page 5: ...g Make sure panels are aligned prior to screwing Pre drill first to prevent wood from splitting 4 Position and attach the 2nd Rear Panel together making sure both rear frames are aligned at top and sides Use 2 2 1 2 Screws in the upper screen frame area as illustrated to the right From the inside angle screw 3 2 1 2 Screws into panel framing to secure completely Use Wood Clamp to hold panels tight...

Page 6: ...8 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 6 5 Align and attach the 3rd Rear Panel as per Step 4 Use 5 2 1 2 Screws to secure Hardware Steps 5 6 S1 2 1 2 Screws x 10 total 6 Align and attach the 2nd Side Panel to the 3rd Rear Panel as per Step 2 3 Use 5 2 1 2 Screws to secure Inside 3 2 1 2 screws A Rear A Rear ...

Page 7: ...ach the remaining 3rd 4th Side Panels as per Step 4 5 to the current secured Side Panels Use 5 2 1 2 Screws per panel to secure Hardware Steps 7 8 S1 2 1 2 Screws x 20 total A Side Front Inside 3 2 1 2 screws 8 Align and attach the 2 remaining Front Panels as per Steps 2 3 6 Attach with 5 2 1 2 Screws per panel A Front ...

Page 8: ...framing with 3 2 1 2 Screws per board Hold framings tight together while screwing Parts Steps 9 13 D1 Interior Panels Rear 41 1 2 x 21 x 2 D2 Interior Panels Sides 32 1 8 x 21 x 2 D3 Interior Panels Front 26 3 8 x 21 x 2 D4 Interior Panels Narrow 18 1 2 x 21 x 2 Hardware Steps 9 13 S1 2 1 2 Screws x 27 total D3 D3 D3 D3 D4 D4 Interior Panel framing flush with Front Panel Framing 10 Align and attac...

Page 9: ...th Rear Interior Panels to the frame of the previous Side Interior Panels as per Step 9 10 11 Attach with 3 2 1 2 Screws per panel 11 Align and attach both Side Interior Panels as per Step 9 10 Attach with 3 2 1 2 Screws per panel D2 D2 13 Align and attach both Rear Interior Panels to the frame of the previous Side Interior Panels as per Steps 4 5 Angle screw 3 2 1 2 Screws into panel framing to s...

Page 10: ...late and frame are flush at bottom Complete both sides Parts Steps 14 16 F Bed Rib Connecting Plates 1 1 16 x 5 1 2 x 20 x 10 G Bed Rib Frames Sides 1 1 2 x 1 1 2 x 25 3 8 x 10 Hardware Steps 14 16 S1 2 1 2 Screws x 20 total SS1 1 Screws x 40 total Y2 1 Brackets x 20 total 15 Locate L Brackets in hardware kit Four brackets are required for completion of each rib section with 5 rib sections in tota...

Page 11: ... position completed short Bed Rib Frame and place between side and interior panel siding Do not center on panel framing and align with bottom of panels Secure with 6 2 Screws per plate both sides of Bed Rib Frame Pre drill to prevent splitting and do not over screw Hardware Steps 9 13 SS1 1 Screws x 60 total Important Do not over screw Complete both sides 18 Complete remaining 4 Bed Rib Frames as ...

Page 12: ...r panel with 3 3 4 Black Headed Screws per hinge Space hinges evenly on door frame Pre drill shallow hole first to prevent wood from splitting Hardware Step 19 SB1 3 4 Black Headed Screws x 12 Pcs Y7 Plastic Hinge x 4 Pcs 20 Attach Cane Bolt to rear of left side Door such that its bottom is flush with the bottom of the door when the bolt is inits upright position Attach with 2 3 4 Black Headed Scr...

Page 13: ...today com sales outdoorlivingtoday com Page 13 Hardware Steps 22 23 SB1 3 4 Black Headed Screws x 18 Pcs Y4 Black Barrel Bolt x 1 Pc 21 Attach Door Threshold directly below front doors flush with front wall framing Use 4 1 Screws and 1 Brackets per end of the door threshold Hardware Step 21 SS1 1 Screws x 8 Pcs Y2 Bracket x 2 Pcs Parts Step 21 I Door Threshold 3 4 x 3 1 2 x 46 x 1 Flush ...

Page 14: ... the cane bolt fits in this hole when dropped into its downward position Drill here Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 14 A Front Front Wall framing 23 Attach Black Barrel Bolt male and female pieces to door and front wall panel frame with 6 3 4 Black Headed Screws Pre drill first to prevent wood from splitting Do a dry run first to con firm fit b...

Page 15: ...wing areas 1 Customer Service 2 On Time Shipping 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual 6 Overall Satisfaction Please call write or email us at The materials contained in this Assembly Manual may be downloaded or copied provided that ALL copies retain the copyright and any other proprietary notices contained on the materials No material may be modified edited or taken ou...

Reviews: