HORIZONTAL VENT PIPING TYPICAL INSTALLATION

Notes:

1 : It is recommended to install termination kit and vent pipe to boiler first

before installing supply & return piping.  If not installed first, installation
of vent pipe will be difficult.

* 2 : Insert vent pipe in boiler vent outlet, apply silicone completely around

edge of outlet and tighten clamp. See figure 5 on page 4.

** 3: Maximum vent length:

10 feet.

Minimum vent length:

24 inches (2 feet).

***4: Vacuum relief valve can be installed horizontally as shown or vertically.

FIGURE 2