4. WALL MOUNTING INSTRUCTIONS
4.1
WALL MEASUREMENT AND DRILLING: Define the area dedicated to the installation of the
panel paying attention to the instructions below. The chosen area and the methodology
installation must ensure compliance with the supplier’s instructions.
VERIFY that the air flow at the rear of the panel is guaranteed. The wall it must not have ele-
ments that could obstruct the correct flow.
4.2
The panel must be installed so that switches or other controls are accessible.
Check that the electrical system is compliant.
4.3
The panel is operated and functions only with the supplied remote control
There are no manual or manually accessible components in the control panel.
4.4
Do not install the panel in front of electrical sockets.
4.5
After mounting, make sure that the electrical socket is easily accessible e is equipped with a
single-pole breaking device with separation distance between the contacts of at least 3mm.
4.6
The power cable supplied with the panel is fitted with a die-cast SCHUKO plug.
Do not use for any reason other connections than the plug-cable supplied.
Do not use the panel if the cable is damaged.
7