2MH/2MJ/2MK/2ML
1-5-43
(3) Detaching and refitting the high voltage PWB
Procedure
1. Remove the developer unit (See page
1-5-27).
2. Remove the drum unit (See page 1-5-
3. Remove the cassette (See page 1-5-6).
4. Remove the left cover and right cover
(See page 1-5-3).
5. Remove the power source PWB (See
page 1-5-40).
6. Turn the machine with the front side up.
7. Remove the stopper.
8. Remove the DU holder.
Figure 1-5-64
9. Pull the DU bush out.
10. Remove the DU cover assembly.
Figure 1-5-65
DU holder
Stopper
DU bush
DU cover
assembly
Y113860-1
Sevice Manual
Summary of Contents for d-Copia 3003MF
Page 4: ...This page is intentionally left blank...
Page 10: ...This page is intentionally left blank...
Page 25: ...2MH 2MJ 2MK 2ML 1 1 11 This page is intentionally left blank Y113860 1 Sevice Manual...
Page 97: ...2MH 2MJ 2MK 2ML 1 3 66 This page is intentionally left blank Service Manual Y113860 1...
Page 137: ...2MH 2MJ 2MK 2ML 1 4 40 This page is intentionally left blank Service Manual Y113860 1...
Page 219: ...2MH 2MJ 2MK 2ML 2 1 24 This page is intentionally left blank Service Manual Y113860 1...
Page 225: ...2MH 2MJ 2MK 2ML 2 2 6 This page is intentionally left blank Service Manual Y113860 1...
Page 254: ...INSTALLATION GUIDE INSTALLATION GUIDE FOR PAPER FEEDER...
Page 257: ...UPDATINGSTATUS DATE UPDATEDPAGES PAGES CODE 02 2012 1ST EDITION 257 Y113860 1...