
4235 Jointer
OLIVERMACHINERY.NET
45
|
Page
Adjust Belt Tension
CAUTION
Belt and pulleys may be hot after operations. Allow components to cool before
servicing.
1.
Disconnect the jointer from the power
source!!
2.
Remove the motor access panel and the belt
cover.
3.
Apply moderate pressure on the V-belt
midway between the two pulleys. Properly
tensioned V-belt should deflect by about
1/4
“
–
1/2".
4.
If V-belt tension needs to be adjusted,
loosen the four motor mounting nuts. Adjust
the motor height until proper belt tension is
reached, then re-tighten the mounting nuts.
5.
If the V-belt needs to be replaced, gradually
walk the belt away from the motor and
eventually remove it from the pulley.
6.
Install a new belt and make sure the belts sit
into the grooves of pulleys. If the belt is too
tight to install, adjust the motor position.
7.
Adjust belt tension and re-secure the motor
as needed.
8.
Reinstall belt cover and motor access panel
when maintenance completes.
Summary of Contents for 4235
Page 2: ......
Page 9: ...4235 Jointer OLIVERMACHINERY NET 9 Page Identification ...
Page 10: ...10 Page Oliver Machinery 4235 Jointer ...
Page 50: ...50 Page Oliver Machinery 4235 Jointer Wiring Diagram ...
Page 51: ...4235 Jointer OLIVERMACHINERY NET 51 Page Parts List Fence Assembly ...
Page 52: ...52 Page Oliver Machinery 4235 Jointer Table and Cutterhead Assembly ...
Page 53: ...4235 Jointer OLIVERMACHINERY NET 53 Page Motor and Cabinet ...
Page 54: ...54 Page Oliver Machinery 4235 Jointer Base Assembly ...
Page 60: ...60 Page Oliver Machinery 4235 Jointer Maintenance Record Date Task Operator ...
Page 61: ...4235 Jointer OLIVERMACHINERY NET 61 Page Notes ...