background image

 

 

To

 

Order

 

Call

: +

90

 

312

 

417

 

72

 

75

 

 

 

 
 
 
 
 
 
 
 
     Take the cartri dge out for starting fill ing 
operation

 

 

 

 

    
 
 
 
 
 
 
 
 
   Place the cartridge to the filling station 

 

 

 

 
 
 
 
 
 
 
 
 
    Flip the handle up to secure the cartridge

 

 

 

 

 
 
 
 
 
        Push the Start/Stop button to start 
filling.Includingpressurizing machine will fill 
the cartridge in 2,5 minutes,when filling 
operation has com pleted place the cartrid ge 
into evacuation stat ion and evacuate 2-3 
seconds for pri ming.

 

 

 

Reviews: