52
BM 25A/AW
Instruction Manual
Gas monitor connection
Once
COM 2100
is running, the BM 25A/AW
connects automatically and a window pops up as
indicated in figure Figure 37: the parameter
programming menu.
Follow the steps below:
■
Set communication parameters as necessary
(port, speed, language)
■
Click the
Connect
button.
Figure 37: the parameter
programming menu
Maintenance menu
Follow the steps below:
■
From the main list of menus, access the
Maintenance
menu.
Options are:
■
Program
: see page 53
■
Calibration
: see page 54
■
Time Setting
: see page 55
■
Monitoring report
: see page 55
■
Status report
: see page 55
Figure 38: Maintenance menu
Summary of Contents for BM 25A/AW
Page 1: ...BM 25A AW Area Gas Monitor Part Number NP25AEN Version C 4 User Manual ...
Page 10: ...10 BM 25A AW Instruction Manual Product Overview Figure 2 Product Overview ...
Page 18: ...18 BM 25A AW Instruction Manual ...
Page 34: ...34 BM 25A AW Instruction Manual ...
Page 70: ...70 BM 25A AW Instruction Manual ...
Page 75: ...9 Special Instructions 75 CSA Control Drawing for BM 25A AW Connections ...
Page 78: ...78 BM 25A AW Instruction Manual ...