background image

Door

100mm

C

D

E

D

X

Door

Y

E

100mm

  S 

 

7

  14 21 28

  M 

1

  8  15 22 29

  T 

2

  9  16 23 30

  W 

3

  10 17 24

  T 

4

  11 18 25

  F 

5

  12 19 26

  S 

6

  13 20 27

C A L E N D A R

FOUNDATIONS

Add 100mm

to roof size 

depth

Add 100mm

to roof size 

width

Add 7 days

for concrete 

to cure

7

Summary of Contents for Treco 103

Page 1: ...9 103 105 107 109 TRECO SHEDS ARE MANUFACTURED TO COMPLY WITH ALL AUSTRALIAN STANDARDS 8 6 10 Please visit the manuals section at our website for any updates or corrections to this manual www oldfield...

Page 2: ...MANUAL All holes for screws are predrilled A power screw driver or cordless drill equipped with a magnetic Philips tip will hasten assembly Take care not to over tighten self tapping screws Sort sepa...

Page 3: ...dder 2 Spanner 3 Tape measure 4 Cordless power screw driver or power drill 5 Dyna bolts not supplied 6 5mm x 36mm recommended 6 Multi grips 7 Philips head screw driver bit P2 6 2 4 3 5 1 7 TOOLS REQUI...

Page 4: ...Ensure roof panel holes are parallel 8 ROOF END PANELS Fasten the roof end panels to the gables Then fasten them to the roof beam using the self tapping screws and plastic washers Fasten in order sho...

Page 5: ...4 4 10 Roof Beam Bracket X15A 4 Self Tapping Screws X12 400 400 400 3 16 Dia Bolts Nuts X13 150 150 150 Left hand Gable N 2 2 2 Roof End Panel RQ 4 4 4 Right hand Gable O 2 2 2 Roof Panel S 4 2 4 Wal...

Page 6: ...X 12 SCREW 3 16 x 3 8 X 13B NUT 3 16 X 13A BOLT 3 16 x 3 8 X11 Washers S Roof Sheet E Entry Exit Ramp L Door Jamb M Front Mid Wall Brace X26 Door Track Bracket W Door Brace D1 Front Base Z X15A Gable...

Page 7: ...termediate Roof Capping U3 Ridge Cover End Roof Capping GA Rear Mid Wall Brace I Front Rear Top Rail 63 65 67 69 83 85 87 89 103 105 107 109 Refer to parts listing for 6 8 10 model shed labels sizes a...

Page 8: ...oor Y E 100mm S 7 14 21 28 M 1 8 15 22 29 T 2 9 16 23 30 W 3 10 17 24 T 4 11 18 25 F 5 12 19 26 S 6 13 20 27 CALENDAR FOUNDATIONS Add 100mm to roof size depth Add 100mm to roof size width Add 7 days f...

Page 9: ...t X9 into X6 as shown and repeat 4 times to create 4 x Door Glide 2 Insert 4 x Door Glide into part I as shown Front Gable PRE ASSEMBLE FRONT AND BACK GABLES ROOF BEAMS AND FRONT BASE RAIL BEFORE EREC...

Page 10: ...ten with 1 x X13A X13B for all 6 and 8 shed models Tighten with 2 x X13A X13B for all 10 shed models I O N STEP 1 Continued 9 Screw Gables to top rail as shown for front gable Note There is no X26 bra...

Page 11: ...of beam Quantity of part P 4 for 10 shed models Join 2 x P for centre roof beam Leave 2 x P P singles for left and right roof beams Roof Beam P X13B Note Top holes for roof xing must be parallel Note...

Page 12: ...11 11 E E D D B B A C A B X20 X20 X20 B D C BASE FRAME ASSEMBLY Front Base Rail Side Base Rails Back Base Rail Corner Gussets E E C D X12 D X12 X12 STEP 2...

Page 13: ...bend With a supporter bend the panels 90 degrees manually Do not over bend F F Supporter Use F6 front half corner panel for 6 shed models only F6 F6 Supporter INSTALLING CORNER PANELS MID TOP WALL BR...

Page 14: ...oof fixing flat side for wall fixing HA HA Midwall Rail H HA B A B X20 X20 Note brace mid wall rail HA and top rail H against ground surface to stabilise front corner panel HA 2 Fix back corner panel...

Page 15: ...with 2 x X12 Wall Panels 4 Fix wall sheet K to the side of shed overlapping the back corner sheet Continue to fix wall sheets K towards front of shed with the last sheet underlapping the front corner...

Page 16: ...ugh the top rail H and gable for each corner 2 Fix back mid wall rail GA to each back corner panel F 3 Fix 2 x X20 corner gussets brackets to each back side mid wall rail HA with back mid wall rail GA...

Page 17: ...front corner panel F and fix with screws to the front top rail I and base rail C repeat for both door sides 6 Fix 2 x M front mid wall rails to front side mid wall rails HA as shown Fix with screws in...

Page 18: ...Centre Roof Beam Fix pre assembled centre roof beam P to top of back and front gables and secure with 2 x X13A X13B for each gable X13B X13A Centre Roof Beam P H Front Gable Back Gable Door Glide H RE...

Page 19: ...x remaining P singles for left and right roof beams Follow diagrams as shown 1 x P single right roof beam 10 models only 1 x P single left roof beam 10 models only INSTALLING LEFT AND RIGHT ROOF BEAMS...

Page 20: ...op of appex to the side wall as shown in diagram Fix screws washers to roof beam s P and side rails H X13A X11 X13B Panel to Panel 3 16 Nut Bolt X12 X11 Panel to Frame P RQ RQ RQ RQ P P X12 P X12 X11...

Page 21: ...ng parts RQ 2 After completion of one side fix back roof panels S on other side Fixing U3 and U2 capping as you progress 3 Note U3 capping are to be placed on front and rear of roof Intermediate roof...

Page 22: ...on inside of base frame after bolting down shed X10 X13B U2 U3 X13A X11 X11 X13A X11 T X8 X13B Place silicone inside shed between base rail and floor STEP 7 STEP 6 Continued Fix roof end cap to front...

Page 23: ...8 TR01031Q X9 After fixing and adjusting the doors attach the door handles and finally the fascia J to front gable rail Doors Note Dynabolt base rails to concrete before fitting doors Construct doors...

Page 24: ...he original purchase and is not transferable 5 Warranty does not cover fasterners 6 Warranty applies to the exclusion of all other representations guarantees or warranties express or implied otherwise...

Reviews: