The following points must be observed:
1
.
Installing the heating system:
•
The cylinder may only be connected to closed-circuit heating systems.
•
The cylinder may only be connected to approved piping systems.
•
ÖkoFEN recommends the installation of a DHW mixer as scalding protection.
•
The piping must be insulated sufficiently to reduce cooling losses.
•
The building clearance for installing and removing the cylinder must be
ensured.
•
The cylinder must be installed in such a way that it can be shut off and emp-
tied.
•
ÖkoFEN recommends use of a pressure regulator in the DHW building con-
nection.
•
A fine filter (backwash filter) must be installed in the DHW building connec-
tion.
•
The pH value must be at least 5.0.
•
Materials that emit chlorides (e.g. seals) are prohibited.
•
In the case of connection to galvanised pipes, no iron or zinc particles may be
washed into the DHW heat exchanger. It is advisable to install a dirt trap.
•
If a corrosion protection additive is employed, it must be compatible with
stainless steel.
2
.
Loading the accumulator
Optionally, the speed of this pump can be controlled by the boiler controller. Pro-
vision mustbe made for a safety pressure relief valve (3 bar) in the accumulator
loading circuit.
1 heating circuit
Boiler controller terminal
à
Output ZW (hot water)
NOTICE
When using 1 heating circuit, at least software version 4.00 is required
2 heating circuits
Boiler controller terminal
à
Output UW
Regardless of the software version, a heating circuit controller is required for two
heating circuits.
4 Requirements for an accumulator