18/01/2021
7
Fixing the high bar to the ground
Material required :
A bubble level
A drill
anchors adapted to
your support
Screws adapted to
your support
Wrench adapted to
your type of screws
Pencil
Check with the O’JUMP service specifying the nature of your support. The type of anchors and screws
depending on whether your floor is concrete, wooden floor, flexible ground...
1.
Put the hand-rail in the low position and adjust the verticality of the uprights with the bubble level.
Check the correct alignment of the uprights.