
Precautions in Ejecting Screws
Use maximum care in ejecting screws from the scooping chamber for changing screw types, replacing the rail and so forth.
◎
Screws could fall into the inside of the feeder if their ejection is mishandled.
◎
If the feeder is tilted or turned back with screws being accumulated at the unloading port or left on the rail, screws could fall
into the inside of the feeder.
◎
Unload screws from the unloading port and move all screws from the rail to the scooping chamber, ejecting them from the
chamber.
◎
See the illustrations below in ejecting screws. Use maximum care in ejecting screws from the scooping chamber not to let
them fall into the inside of the feeder.
①
Turn off the power switch.
②
Unload screws from the unloading port.
③
Move all the screws from the rail to the scooping chamber.
Check that no screws are left at the unloading port and on the rail before
ejecting screws from the scooping chamber.
④
Eject the screws from the scooping chamber.
– 5 –
①
③
④
②