TABLE OF CONTENTS
LIST OF ILLUSTRATIONS
FIGURE NO.
TITLE
Page No.
3-58
Screws removed from Bottom Mounting Plate inserted into the Hanger.............3-23
3-59
Shims are inserted between the Hanger and the Load Cell................................3-23
3-60
Analytical balance Load Cell with Top Bracket visible ........................................3-23
3-61
Vertical Flexure and screws, Lock Plate, washers, and bushings, removed.......3-23
3-62
Top Flexure Arm (Analytical)...............................................................................3-23
3-63
Bottom Flexure Arm (Analytical)..........................................................................3-23
3-64
Hanger with two screws ......................................................................................3-25
3-65
Service Fixture attached to the front of Load Cell after removing Hanger ..........3-25
3-66
The Vane is secured by two screws near the rear of the Load Cell ....................3-25
3-67
The Vane removed..............................................................................................3-25
3-68
Two solder points on PSB, and two screw holes for removing the board ...........3-26
3-69
Contact Board with 3-wire ribbon cable soldered to it .........................................3-26
3-70
Four screws secure the Magnet Half to the Ratio Beam.....................................3-26
3-71
The Magnet Half, when removed, should be cleaned .........................................3-25
3-72
A screw connects the Contact Board to the Load Cell ........................................3-26
3-73
Use a smaller screw to temporarily fasten it to the Ratio Beam..........................3-26
3-74
The Sideways Motion Stop Plate and the black Up/Down Stop screw ...............3-27
3-75
Position Sensor Board (Analytical)......................................................................3-28
3-76
Adjust Position Sensor Board vertically until
Err8.X
does not appear.................3-28
3-77
The Ratio Beam needs to clear the groove in the Up/Down Stop Screw............3-29
3-78
Service Fixture is installed prior to installing Ratio Beam Flexures.....................3-29
3-79
Sideways Motion Stop Plate and Up/Down Stop Screw .....................................3-29
3-80
Elongated holes on Ratio Beam Flexures go on the bottom ...............................3-29
3-81
Installing the Magnet Half....................................................................................3-30
3-82
Four screws on Magnet Half ...............................................................................3-30
3-83
Position Sensor Board.........................................................................................3-30
3-84
3-wire cable soldered to Contact Board ..............................................................3-30
3-85
Installing the Vane...............................................................................................3-30
3-86
Screws removed from Bottom Mounting Plate inserted into the Hanger.............3-31
3-87
Insert shims between the Hanger and the Load Cell on both sides ....................3-31
3-88
Bottom Flexure Arm ............................................................................................3-31
3-89
Top Flexure Arm..................................................................................................3-31
3-90 Vertical
Flexure ...................................................................................................3-31
3-91
Vertical Flexure and screws, Lock Plate, washers, and bushings, removed.......3-31
3-92
Analytical InCal Load Cell with Top Bracket visible.............................................3-32
3-93
Analytical balance Load Cell with Top Bracket visible ........................................3-32
3-94
Bottom Mounting Plate on Analytical Load Cell ..................................................3-32
3-95
Ribbon cable connects PSB to Main PCB...........................................................3-32
3-96
When Position Sensor Board shows normal weight, tighten its screws ..............3-33
3-97
Block Style Load Cell ..........................................................................................3-34
3-98
Service Toolset for Block Style Load Cells. PN 476000-030 .............................3-35
3-99 InCal
Motor..........................................................................................................3-36
3-100
InCal Motor Removal...........................................................................................3-36
3-101 Motor
Coupler .....................................................................................................3-36
3-102
Motor Shaft in counter-clockwise position ...........................................................3-37
3-103
Mounting Screws holding InCal Mechanism .......................................................3-37
3-104
Removing the InCal Mechanism .........................................................................3-37
3-105
InCal Mechanism Alignment................................................................................3-38
3-106
Centering InCal Weight .......................................................................................3-38
Ohaus Corporation www.ohaus.com
v
Pioneer™ Balances Service Manual