OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com
12
20. For tests above 200°F (93.3°C), screw the two clamps into the holes on
the bulkhead to secure the cell in place.
21. Inspect the o-rings (#130-77-5) on the two pressure port connectors on
the test station for damage and replace them if necessary.
22. Line up the inlet and outlet ports with the two pressure lines and tighten
the connections.
The ports and pressure lines are designed to only line up one way. If they
do not fit correctly, rotate the cell within the heating well until they are in
position.
23. Tighten the cell locking screw to hold the cell in place during the test.
24. Swing the transducer housing around so that it rests above the test cell.
The distance between the bottom of the transducer housing and the
top of the tower should be 8.5" (22 cm). If it is not, adjust the arm of the
transducer housing to raise or lower it to the correct position.
8.5"