OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com
15
Operation
1.
Plug the heating jacket into an appropriate power source. Place a ther
-
mometer (#154-20) into the heating well and preheat to 10°F (6°C) above
the test temperature. A pilot light will come on when the heating jacket
reaches the temperature set by the control knob.
2.
If the cell caps are not already assembled, see page 21 for assembly
instructions.
3. Inspect the cell cap and cell body. Discard any components that show
signs of corrosion, damage, or wear.
4.
Inspect all o-rings. Replace any that show signs of damage or wear.
Looks for nicks, cuts, or brittle o-rings. Replace all o-rings after any test
above 350°F (176.7°C). Place a thin film of silicone grease on all o-rings.
5.
Place an o-ring (#170-13-3) on the shoulder inside the cell body on the
end marked “In”. Place another o-ring in the groove around the cell cap.
6. Place a cement screen on top of the o-ring.
7.
Make sure all threads are clean and free of debris.
8. Apply anti seize compound (#165-44-2) to the threads of the cell locking
rings and valve stems.
Cement Screen
(#170-18)
O-ring
(#171-190-060)
Valve Stem
(#170-16)
O-ring
O-ring