![office bricks MOBILE UNIT Installation Instructions Manual Download Page 30](http://html1.mh-extra.com/html/office-bricks/mobile-unit/mobile-unit_installation-instructions-manual_3427503030.webp)
30
Carpet: Before putting in the carpet, remove the protective foil from the
double sided adhesive tape. Then put in the carpet tiles.
Connect the power cable to the mains supply.
6 Lay Carpet tiles
Dispose of the packaging material properly according to
regulations at the appropriate disposal point.
i
LAY CARPET TILES
7 Maintenance and care
After assembly the cabin has to be cleaned. Wipe all surfaces with a soft,
lint-free cloth. Do not use any aggressive cleaning agents.
Summary of Contents for MOBILE UNIT
Page 1: ...INSTALLATION INSTRUCTIONS SOUND INSULATING CABIN MOBILE UNIT...
Page 2: ...2...
Page 4: ...4 1 Scope of delivery SCOPE OF DELIVERY The cabin parts are delivered in one wooden box i...
Page 21: ...21 INSTALLATION OF WALLS AND DOOR WINDOWS 1 2 3 2x Wooden Strips...
Page 29: ...29 ROOF ASSEMBLY AND ELECTRIC CONNECTION...
Page 33: ...33 DISASSEMBLY...