![office bricks MOBILE UNIT Installation Instructions Manual Download Page 15](http://html1.mh-extra.com/html/office-bricks/mobile-unit/mobile-unit_installation-instructions-manual_3427503015.webp)
15
INSTALLATION OF WALLS AND DOOR/WINDOWS
!
The door is secured by adhesive safety-strips attached to the
door frame. Do not remove the adhesive strips until level D has
been installed, otherwise additional securing of the door is
required.
!
CAUTION - THE DOOR CAN TIPP OVER IF NOT SECURED. IT HAS TO BE
HELD BY ONE FITTER:
1.
Remove the protective foil from the glass door.
2.
Two fitters are needed to position the door into the notch on the floor
plate. The correct position is in the middle of the front side.
3.
Place Brick A1 and A5 on the right and left side of the door. Push the bricks
onto the black connecting clips which are on the side of the door frame. Push
the bricks from above into their correct position. Do not remove the adhesive
tape which secures the door and prevents it from opening.
Summary of Contents for MOBILE UNIT
Page 1: ...INSTALLATION INSTRUCTIONS SOUND INSULATING CABIN MOBILE UNIT...
Page 2: ...2...
Page 4: ...4 1 Scope of delivery SCOPE OF DELIVERY The cabin parts are delivered in one wooden box i...
Page 21: ...21 INSTALLATION OF WALLS AND DOOR WINDOWS 1 2 3 2x Wooden Strips...
Page 29: ...29 ROOF ASSEMBLY AND ELECTRIC CONNECTION...
Page 33: ...33 DISASSEMBLY...