Summary of Contents for OE-22

Page 1: ...VICE ANDOPERATING MANUAL CERTLI AMERICAN OIL BURNER MODELOE z J 1 5 oE 22 oE 21 CERTLIANtrRIGAN PHONE N Y C 2121895 2196 516 543 4600 Outside N Y State TollFree 800 645 4504 ABC SUNRAYCORP 85AUSTINBLVD COMMACK N Y 11725 I e o I I J rFl tDng a r 5 J ...

Page 2: ...ITOR START CAD CELL COfTROLWITH INTERRUPTED IGNITION t 65 3 5 THE BURNERMUST BE NOZZLES 450 soLlDs MATCHEDToTHEPREc sEBo LERBACKPRESSURE ARERECoMMENDED So 600 ANDEoosoL DsMAYALSoBEUSED 9 IDENTIFICATION ELECTRODE SETTING Fig 1 TUBE IN INCHES RATING 10H I LENGTH OF FIRING I CONTROL I 1 65 3 5 2 325 6 O H HONEYWELL U WHITERODGERS 1 I l 0E 2 1 BURNER TYPE Page2 ...

Page 3: ...ank outletandcloseto burnerfuel pumpahead of the filter Connect thefilterto the pumpwith acopper tubepigtail Do not connect rigidpipedirect ly to thepump 3 3 A returnlineisnot required for thistype installation 3 4 lf morethanoneburnerisconnected to suctionline thetankbottommustbeabove bothburner pumps andthesizeof lineandfilter mustbeincreased 3 8 Underground or VaultedTanks 3 5 l seTr O D copper...

Page 4: ...be usedfor eachburner A commonreturn linemaybe used provided pting jouJed ballcheckisinstalled in the returnpipefrom eachfuelunit FUELOIL FILTER A filter isrecommended in the suctionline sizethefilteraccording to GPHof the nozzle on single pipeinstallations Uselarger filterson 2 pipe systems 20to 30 GPHfilter rating INSTALLATION Usea baseor flangemounting whichever isthe mostpractical for the inst...

Page 5: ...nozzleassembly to install or replace thenozzle The nozzleassembly can be removed step by stepasfollows v 6 2 6 3 a b c Open up the cover bY removingthe coverscrews SeeFig 3 Disconnect the oil line to the nozzle assembly SeeFig 4 Disconnect the ignitioncables at trans former d Turn assembly to 90oclockwise e Then pull assembly straightbackwards slowly Fis 3 Fis 4 pI v Page 5 ...

Page 6: ...o q i rg f 6 _ s r a a v fs J o llj qE q g o F o 2 F v Page6 ...

Page 7: ... z r f 6 UJ F F n n z I o z o C z gEgeg s e Q A sEEbE R sng EH rs su o 6 0 0 C I r F O F O F F F F T F l e Y O N 0 o o c D o I 9 e l g r s f l J c l r O Q N Y r s f t O o F C r N N N C c c c N c r t c r t c Y l c D c q r i c n a 6 F F F F F F F F F F F F F F F F F F q ul o J UJ o o q o l bP T 8 fi gi i 7 n E t i g i 9o FF t i E F Eoi ess F fu E i5F ig _s Ett scBEsE ESE Ei r E FiF igg q a toX toor9...

Page 8: ...of lineandaboveor awayfrom surrounding objects It should betile lined with noobstructions andbein a goodstateof repair with no leaks Thesmokepipeshould be inserted flushwith theinside of thechimney tile andsealed in place All cleanout doorsshould besealed DRAFTREGULATORS The useof a draft regulator is recommended andshouldpreferably be mountedin the smoke pipe 8 2 Useadraftgauge to adiust to the p...

Page 9: ...eferto the chartfor the correctchamber dimensions Chambers mayvaryslightlybut should maintain thefloorarea shown inTable1 TABLEI MINIMUM COMBUSTION AREA N AREA RADIATION Air Water BTU Sq Ft X 1000 Floor To Center Of Nozzle Crown Sheet To Center Height Of Nozzle 660 700 1056 1120 185 196 12127 13137 800 1000 1280 1600 224 280 13137 14147 15 16 2 00 2 50 1920 2240 336 392 15 15 7 15 15 7v 1200 1400 ...

Page 10: ...tor BX cable to hot surfaces 12 STARTING THEBURNER 12 1 Besurethe boiler if used is filledwith water Besurethe oil tank isfilled allvalvesopen and controlssetto allow burneroperation Be surethe nozzleassembly is correctlypositioned for theinput nozzle size used Ref Table2 12 2 Openthe burnerair adjustment partially Ref Fig 5 and6 openthe fireor inspection door andturn on theservice sruitch Adjustd...

Page 11: ... 87 5 95 1 81 1 84 2 O1 2 04 2 21 2 24 2 35 2 38 2 48 2 52 2 68 2 72 3 O2 3 06 3 35 3 40 3 69 3 74 4 O2 4 08 4 69 4 76 5 37 5 44 6 04 6 12 r 86 1 89 1 91 2 O7 2 O9 2 12 2 27 2 30 2 33 2 41 2 44 2 47 2 55 2 58 2 62 2 76 2 79 2 83 3 10 3 14 3 18 3 45 3 49 3 53 3 79 3 84 3 89 4 13 4 19 4 24 4 82 4 89 4 95 5 51 5 58 5 66 6 20 6 28 6 36 Prime thepumpwith oil on longsuction lines Whenthe fire is establi...

Page 12: ...5 Checkthe operationof the limit controlsandthethermostat 14 6 Checkfor oil leaks All installations shouldbereinspected after1to 2 weeks of normaloperation OIL BURNER OPERATING INSTRUCTIONS ThisBurner islisted by UNDERWRITERS LABORATORIES lNC andotheragencies for V fueloil not heavier thanNo 2 commercial standard CS l2 48 Date DATA StackCO2 OverfireCQ2 Smoke SpotNo Air ShufterSetting StackTemp Fo ...