9
Maintenance
Oil amounts for each series of Torque-Hub
®
drives are indicated in
the appropriate series literature. An initial oil change should be
made after the first 50 hours of operation. Subsequent oil changes
should be made at 1,000 hour intervals or annually, whichever
comes first.
Oil temperatures should be not higher than 160° to 180°F for
continuous operation, and no higher than 200°F for intermittent
operation. For special applications, high horsepower, high speeds
or wide temperature changes, please consult Oerlikon Fairfield.
Oil Fill Level
When the Torque-Hub
®
unit is mounted horizontally, unless
otherwise specified, the gearbox should be filled half-full of oil.
Consult the appropriate series literature for approximate fill
volumes. Vertically mounted Torque-Hub
®
units may require special
lubrication procedures. Please contact Oerlikon Fairfield for
vertically mounted applications.
Summary of Contents for S12 Series
Page 1: ...1 Torque Hub Planetary Final Drive S16A1 2 Series Service Manual Rev 9 3 13 ...
Page 10: ...10 DISASSEMBLY ...
Page 22: ...22 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 23: ...23 ASSEMBLY ...
Page 36: ...36 Planetary Final Drive Service Manual Assembly Drawing ...
Page 40: ...40 T158149 LOADING PLUG AND BASE ...
Page 41: ...41 T160764 BEARING CUP ASSEMBLY PRESSING TOOL ...
Page 42: ...42 T223131 LOCKNUT WRENCH ...
Page 43: ...43 T119240 LOCKNUT WRENCH ...
Page 44: ...44 T154563 ASSEMBLY PRESSING TOOL ...
Page 45: ...45 T139345 ASSEMBLY PRESSING TOOL ...
Page 46: ...46 T137786 TOOL TO PRESS IN SEAL ...
Page 47: ...47 T158049 BEARING CONE PRESSING TOOL ...
Page 48: ...48 T136184 TOOL TO PRESS BEARING ON SHAFT ...
Page 49: ...49 T159173 PRESSING TOOL TO INSTALL BEARING CONE ...
Page 50: ...50 T173814 LEAK TEST FIXTURE ...
Page 51: ...51 T220225 LEAK TEST TOOL ...
Page 52: ...52 T224477 ROLL TEST TOOL ...
Page 53: ...53 T223989 ROLL TEST TOOL ...
Page 54: ...54 T158149 LOADING PLUG AND BASE FOR ASSEMBLY ...