
Operation
GA 09.033/6.02 – (2011-07) –
©
Oerlikon Leybold Vacuum
81
I/O test
Transmit:
TIO
[,x] <CR>[<LF>]
│
└─
x =
0 –> Stops the test (default)
1 –> Setpoint relay off,
error relay off
2 –> Setpoint relay on,
error relay off
3 –> Setpoint relay off,
error relay on
4 –> Setpoint relay on,
error relay on
Receive: <ACK><CR><LF>
Transmit: <ENQ>
Receive: x
<CR><LF>
│
└─
I/O test status
Operator key test
Transmit:
TKB
<CR>[<LF>]
Receive: <ACK><CR><LF>
Transmit: <ENQ>
Receive: xxx
<CR><LF>
│││
││└─
Key 3
x = 0 –> Not pushed
││
1 –> Pushed
││
│└──
Key 2
│
└───
Key 1
RS232 test
Transmit:
TRS
<CR>[<LF>]
Receive: <ACK><CR><LF>
Transmit: <ENQ>
Starts the test (repeats each
character, test is interrupted
with <CTRL> C).