
Operation
GA 09.033/6.02 – (2011-07) –
©
Oerlikon Leybold Vacuum
55
4.6.3 Test Programs
RAM test
Test of the main memory.
Test sequence
The test runs automatically one
time:
Ö
Test in process (very briefly).
Ö
Test finished, no error found.
Ö
Test finished, error(s) found.
The
lamp flashes.
EPROM test
Test of the program memory.
Test sequence
The test runs automatically one
time:
Ö
Test in process
Ö
Test finished, no error found.
After the test, a four-digit
checksum (hexadecimal for-
mat) is displayed.
Ö
Test finished, error(s) found.
After the test, a four-digit
checksum (hexadecimal for-
mat) is displayed. The
lamp flashes.