1.4 Commissioning
1.4.1 General
The pump / pump aggregate may be commissioned only by the trained personnel
of the operating party or by members of the Barmag pump service.
Check the direction of rotation of the drive before each recommissioning (see
arrow on front side of pump for permissible direction of rotation). The wrong rota-
tion direction can damage the pump and the installation.
Easy running of the spin-finish pump by manually turning the pump drive shaft
into the mandatory sense of rotation.
Make sure that the corresponding hoses are connected to the pump intake and
outlets.
1.4.2 Resuming Operation after Pump Standstill
Supply of spin-finish:
▪
In case a standstill of more than 1 day (according to the spin-finish type other
periods are possible, too; see specifications of spin-finish producer) is to be
expected, the pump must be rinsed for about 1 hour with max. 25
1
/
min.
. The
rinsing medium is a mixture of demineralized water and about 3% of spin-
finish oil. This procedure has to be repeated about every 3 days.
GF
Spin-finish pump
Translation of the assembly instructions, V16
10/2022 1-007-3296
TDD-00019389
8
1 Mounting instructions