background image

2

Attention:

1. All operators who operate and test our company’s factory instrument must read
this manual carefully before operation. Only the instrument of this company is
operated according to the operation manual of this company, can the instrument
work normally.
2. The usage of the instrument of this company must conform to the regulations
confirmed by the operation manual. The maintenance of the instrument and
changing of the parts must adopt accessories offered by this company, and the
maintenance operators must be the works who have been trained.
3. If the user repairs this product or change accessories arbitrarily and does not
conform to the above-mentioned manual, the operator shall be responsible for the
reliability of the instrument. And this company is not responsible for the warranty.
4. This machine is non-explosion-proof equipment. Please install it in a safe
environment. The installation process must comply with the relevant national
authoritative standards.
5. The usage of this instrument also should conform to the laws and regulations of
the domestic relevant departments and instrument management of the factory.
6. Resistive touch screen is easy to be damaged by scratches, so do not use hard
materials for touch operation.
7. In strict accordance with the output relay capacity to connect external devices,
so as not to damage the host. For external equipment beyond capacity, please add
AC contactor.
8. The machine should be grounded reliably in use. If there is no grounding wire

Summary of Contents for AQM-09

Page 1: ...AQM 09 Air quality monitor system Operating Manual Henan Oceanus...

Page 2: ...he above mentioned manual the operator shall be responsible for the reliability of the instrument And this company is not responsible for the warranty 4 This machine is non explosion proof equipment P...

Page 3: ...is a new product which can monitor the air quality via the value of O3 SO2 NO2 CO PM2 5 PM10 etc The target value is converted into voltage signal by operational amplifier circuit and then filtered t...

Page 4: ...safe and reliable Please do not put this monitor in the high temperature moist or strong static environment Please do not install monitor in a large quantity of dust salt and metal powder Please do n...

Page 5: ...aste disposal station or yard mining industry heavy industry airport wharf railway construction site Residential quarters schools hospitals Environmental impact assessment and source apportionment II...

Page 6: ...Humidity 90 RH power 20W Humidity 90 RH power 40W Dimensions 500 400 300mm Protection grade IP55 Range PM2 5 0 1000 ug m3 PM10 0 1000 ug m3 Sampling flow rate 1 3L min 0 15 Sampling time Adjustable de...

Page 7: ...ne monitoring monitoring system HJ_T 524 2009 air pollutant name code Technical requirements of HJ 907 2017 automatic monitoring system for environmental noise HJ663 2012 technical specification for e...

Page 8: ...40 70 degrees Celsius The high precision ADC data acquisition system can monitor pollutants at ppb level The dynamic heating dehumidification control is adopted to remove the influence of water mist...

Page 9: ...d other ways any installation mode is solid and reliable and can resist instantaneous 12 level wind III Function introduction Cyclone type physical cutter The particle concentration was measured by la...

Page 10: ...value of particles After coefficient conversion the dust concentration value is output in real time through data interface With cyclone physical cutter and PID real time temperature control system the...

Page 11: ...11 3 3 System From the main interface choose the system you can check and modify system setting...

Page 12: ...rface choose the user you can calibrate the dust value the password is 123456 IV Installation 4 1 Installation notes 1 When installing products please refer to the relevant literature to meet the basi...

Page 13: ...n coal mines The relevant provisions of GB3836 16 2006 Electrical equipment for explosive gas environment Part 16 Inspection and maintenance of electrical devices except coal mines and GB50257 1996 Co...

Page 14: ...al and industry Fault Possible cause Solve Can t start to work Unconnected power supply Check whether the power line is inserted Can t connect the platform The SIM card insert wrong side Check whether...

Page 15: ...ronment in the warranty period the company would not be responsible for it If the machine cannot work because of the quality problem our company would maintain or change in free for the user The compa...

Page 16: ...16 Henan Oceanus Import Export Co Ltd Email info china oceanus com Web http china oceanus com...

Reviews: