![OCEANAIRE 2OACH1211 Engineering, Installation And Service Manual Download Page 12](http://html1.mh-extra.com/html/oceanaire/2oach1211/2oach1211_engineering-installation-and-service-manual_723147012.webp)
INSTALLATION INSTRUCTIONS
RECEIVING
—
INSPECTION
Upon receiving your 2OACH1211 unit, inspect the packaging for any damage. All
units are shipped on a skid, and packaged in a triple-wall carton for added
protection.
BEFORE INSTALLING
Check the unit for any damage. All OceanAire products are thoroughly inspected at
the factory and carefully packaged. If any damage is evident, contact OceanAire
IMMEDIATELY.
ELECTRICAL REQUIREMENTS
Check the nameplate located on the back of the unit to confirm the proper power is
available for the unit.
Refer to "Specifications"
section for voltage and amperage
requirements. For proper NEMA receptacles, refer to "Electrical service plug
configuration". When using extension cords, use the proper gauge cord, and check
cord voltage to the unit.
TIME DELAY FUSES/CIRCUIT BREAKERS ARE RECOMMENDED
WARNING
—
OPERATING THE UNIT ON IMPROPER
VOLTAGE WILL VOID THE WARRANTY
ACCESSORIES
Verify that all accessories are correct for the model, and are installed in accordance
with all instructions.
START-UP
Install the unit in accordance with all local and state building codes, and install all
accessories. Allow for a clearance around the unit for future maintenance and/or
service. Level unit and lock casters. Connect power and test the LCDI on the power
cord. Power up unit, via thermostat and check for proper operation. Refer to
Thermostat Operation for more details.
10
Summary of Contents for 2OACH1211
Page 20: ...18 PIPING SCHEMATIC ...