When using the low pressure testing method,
the process must be done carefully and the
inspection must be made at every connection
point. If all the tests are satisfactory, proceed to
final stages of installation. If there are any
problems, correct each problem and test each
solution, reinspect all problem points to make
certain the correction has been made and
successful. Repeat the above testing
procedures on the entire system.
When all tests are complete and there are
absolutely no issues, installation has been
complete.
Clean up the work areas, and apply weather
seals from both sides of throughways for lines.