INSTALLATION INSTRUCTIONS
RECEIVING—INSPECTION
Upon receiving your 2OACH unit, inspect the packaging for any damage. All units are
shipped on a skid, and packaged in a triple
-
wall carton for added protection.
BEFORE INSTALLING
Check the unit for any damage. All OceanAire products are thoroughly inspected at the
factory and carefully packaged. If any damage is evident, contact OceanAire
IMMEDIATELY.
ELECTRICAL REQUIREMENTS
Check the nameplate located on the back of the unit to confirm the proper power is
available for the unit.
Refer to "Specifications"
section for voltage and amperage
requirements. For proper NEMA receptacles, refer to "Electrical service plug
configuration". When using extension cords, use the proper gauge cord, and check
cord voltage to the unit.
TIME DELAY FUSES/CIRCUIT BREAKERS ARE RECOMMENDED
WARNING
—OPERATING THE UNIT ON IMPROPER
VOLTAGE WILL VOID THE WARRANTY
ACCESSORIES
Verify that all accessories are correct for the model, and are installed in accordance
with all instructions.
START
-
UP
Install the unit in accordance with all local and state building codes, and install all
accessories. Allow for a clearance around the unit for future maintenance and/or
service. Level unit and lock casters, when available. Connect power and test the
LCDI on the power cord (if available). Power up unit, via thermostat and check for
proper operation. Refer to Thermostat Operation for more details.
16
Summary of Contents for 2OACH1811
Page 26: ...24 PIPING SCHEMATIC...
Page 27: ...25 WIRING SCHEMATIC FOR 2OACH12 18 and 24 DISCHARGE TEMP SENSOR...
Page 28: ...26 WIRING SCHEMATIC FOR 2OACH3612 DISCHARGE TEMP SENSOR...
Page 29: ...27 WIRING SCHEMATIC FOR 2OACH6012 DISCHARGE TEMP SENSOR...
Page 31: ...29 WIRING SCHEMATIC FOR 2OACH3632 DISCHARGE TEMP SENSOR...
Page 32: ...30 WIRING SCHEMATIC FOR 2OACH3634 DISCHARGE TEMP SENSOR...
Page 33: ...31 WIRING SCHEMATIC FOR 2OACH6032 DISCHARGE TEMP SENSOR...
Page 34: ...32 WIRING SCHEMATIC FOR 2OACH6034 DISCHARGE TEMP SENSOR...