OBERON NetPoint 3032 Series Installation Manual Download Page 2

Installation Guide / 

Guía de instalación

 

for Oberon Model 3032

-

00

-

XX

 

para Modelo Oberon 3032

-

00

-

XX

 

 

 

 

Mounting Solutions for WiFi Access Points

 

"Oberon" and all other marks where denoted are trademarks of Oberon Inc.  

©

1999

-

2020 Oberon Incorporated. All rights reserved.

 

"Oberon" y todas las demás marcas donde se denotan son marcas comerciales de Oberon Inc.  ©1999

-

2020 Oberon Incorporated. Todos los derechos reserve.

 

Model 3032 

-

 Rev. 8/2/2020

 

 

Dig a hole at least 11.5” diameter minimum in the desired location for the assembly. The hole depth is determined by the frostline of the installation location. 
30” is the minimum recommended. The sidewalls must be flush and plumb. Uneven sidewalls can cause the foundation to fail or tilt.

 

Cave un agujero de al menos 11.5" mínimo en la ubicación deseada para el ensamblaje. La profundidad del pozo está determinada por la línea de hielo de la 
ubicación de instalación. 30" es el mínimo recomendado. Las paredes laterales deben estar niveladas y a plomo. Los flancos desiguales pueden hacer que 
la base falle o se incline.

 

1

 

Dig the trench for laying conduit. Data and power cables must be separated when running conduit to the bollard. Place the conduit within the trench and up 
through where the anchor base concrete will be poured. 

 

Cave la zanja para colocar el conducto. Los cables de datos y alimentación deben estar separados cuando se conduce el conducto hacia el bolardo. Colo-
que el conducto dentro de la zanja y hacia arriba a través del lugar donde se va a verter el hormigón de la base del anclaje.

 

2

 

Follow local code requirements for buried conduit. Fill around the conduit with gravel if necessary. Mix and pour the concrete around the conduit. 3000 to 
3500 psi concrete is recommended. 

 

Llene alrededor del conducto con grava si es necesario. Mezcle y vierta el concreto alrededor del conducto. Se recomienda un concreto de 3000 a 3500 psi.

 

3

 

Using the template, create a bolt positioner board to hold anchor bolts in place while the concrete sets and drill a center hole large enough for conduit. Fasten 
5/8” x 18” anchor bolts in a 8.5” diameter circle to the board using 5/8” nuts and washers above and below, leaving 2.5” or greater above the board. Oberon’s 
39

-

303X

-

FOOTING KIT includes a template, bolts, and hardware for anchor bolt positioning. The bolts must be tight to prevent them from migrating while 

installing.

 

Usando la plantilla, crea una tabla de posicionadores de pernos para mantener los pernos de anclaje en su lugar mientras se establece el concreto. Sujete 
pernos de anclaje de 5/8" x 18" en un círculo de 8.5" de diámetro a la placa con tuercas y arandelas de 5/8" arriba y abajo, dejando 2,5" o más arriba del 
tablero. KIT 39

-

303X

-

FOOTING de Oberon incluye una plantilla para el posicionamiento del perno de anclaje.

 

4

 

Limestone or other sand 

Buried Electrical Cau on Flagging 

Reviews: