background image

 

1. 

General Information 

 

The soil conditions for the structures should be leveled and load-bearing. 

 

The electrical connection may only be carried out by a qualified electrician.  

 

The completed photovoltaic project should be completely surrounded by a fence 
to protect it from unauthorized access or damage by wild animals. 

 

All packaging material must be disposed properly in accordance with legal and 
technical regulations. See EN 378. 

 

The mounting systems from Oberhauser serve exclusively as substructure for 
installing photovoltaic modules and may only be used in accordance with their 
structural analysis. 

 

The photovoltaic modules may only be installed in accordance with the 
manufacturer's instructions. 

 

1.1   

Designation of the individual parts 

 

A = Ram profile C140 x 80 mm, Length according to requirements 

 

B = Rafter profile C100 x 50 mm, Length according to requirements 

 

C = Purlin C75 x 50 mm, Length according to requirements 

 

D = Purlin connector  

 

E = Hexagonal screw DIN 933 

 M12 x 40, Material: A2-70 or 8.8 

 

F = Washer DIN 9021 

 13,0 mm; Material: A2 

 70 or 8.8 

 

G = Hexagonal nut DIN 6923 

 M12; Material: A2 

 70 or 8.8 

 

H = Module middle clamp 

 

I = Module end clamp 

 

J = Diagonal brace 50 x 50 x 5 mm; Material: Galvanised steel 

1.2   

Overview of required tools and auxiliary materials 

 

Iron bars 

 

Cordless screwdriver with torque limiter 

 

Pencil 

 

Inclinometer 

 

Large angle approx. 2000 mm 

 

Screw insert 6 mm 

 

Ratchet with torque and socket wrench insert 19 mm 

Summary of Contents for FRTSTV

Page 1: ...Installation Manual Art Nr FRTSTV Open Land System ISYS 1 1...

Page 2: ...itate to contact us at any time Content 1 General Information 3 1 1 Designation of the individual parts 3 1 2 Overview of required tools and auxiliary materials 3 1 3 Tightening torques for screws 4 2...

Page 3: ...ystems our specially developed mounting systems have significant time saving features that enable more efficient work when mounting the substructure and modules If you do not want to deal with the ins...

Page 4: ...photovoltaic modules may only be installed in accordance with the manufacturer s instructions 1 1 Designation of the individual parts A Ram profile C140 x 80 mm Length according to requirements B Raft...

Page 5: ...on are decisive for the length of the piles These are rammed into the ground by pile driving machines whereby optimum alignment in all directions is possible Step 1 Measuring of the ram points and mat...

Page 6: ...5 1 2 Step 2 Ramming works A...

Page 7: ...6 2 1 Step 3 Installation of rafter profiles A B E F B A G Torque 100 Nm A2 A4 130 Nm HV...

Page 8: ...7 1 2 Step 4 Installation of diagonal braces E F J B A E F G J B A G Torque 100 Nm A2 A4 130 Nm HV...

Page 9: ...8 1 2 3 Step 5 Installation of purlins G B E F C G B C Torque 60 Nm...

Page 10: ...9 1 2 Step 6 Installation of purlin connectors The number of connectors to be used depends on the table design Torque 60 Nm E F B C D G...

Page 11: ...10 Click in Click in 1 2 3 4 Step 7 Installation of modules C I Torque 8 10 Nm...

Page 12: ...11...

Page 13: ...12 Click in Click in Press Press 5 6 7 H...

Page 14: ...13 8 9 Torque 8 10 Nm Continue until the last module in the row is fixed At the end of the row a module end clamp is used again...

Page 15: ...hief In order to prevent this from happening we will be pleased to supply you with our safety balls or optionally shear nuts and or safety screws on request Depending on the measures selected theft is...

Page 16: ...client by means of appropriate expert opinions when the contract is awarded The company Oberhauser Bau Systeme GmbH certifies surface lifetime of 25 years within the scope of and in accordance with al...

Page 17: ...iod from the day of building approval but at the latest from the day of final invoicing 11 These conditions are a complete part of the contract concluded between Oberhauser Bau Systeme GmbH and the cu...

Page 18: ...the current state of the art Oberhauser is not liable for improper handling of the installed components With proper handling dimensioning according to the static conditions adherence to the maintenanc...

Page 19: ...18 Oberhauser Bau Systeme GmbH Rohrbach Bahnhof 18 84494 Niederbergkirchen Tel 49 0 8635 69392 0 Fax 49 0 8635 69392 20 E Mail info oberhauser pv de...

Reviews: