General Information
•
The soil conditions for the structures should be leveled and load-bearing.
•
The electrical connection may only be carried out by a qualified electrician.
•
The completed photovoltaic project should be completely surrounded by a fence
to protect it from unauthorized access or damage by wild animals.
•
All packaging material must be disposed properly in accordance with legal and
technical regulations. See EN 378.
•
The mounting systems from Oberhauser serve exclusively as substructure for
installing photovoltaic modules and may only be used in accordance with their
structural analysis.
•
The photovoltaic modules may only be installed in accordance with the
manufacturer's instructions.
1.1
Designation of the individual parts
A = Ram profile C140 x 80 mm, Length according to requirements
B = Rafter profile C100 x 50 mm, Length according to requirements
C = Purlin C75 x 50 mm, Length according to requirements
D = Purlin connector
E = Hexagonal screw DIN 933
–
M12 x 40, Material: A2-70 or 8.8
F = Washer DIN 9021
–
13,0 mm; Material: A2
–
70 or 8.8
G = Hexagonal nut DIN 6923
–
M12; Material: A2
–
70 or 8.8
H = Module middle clamp
I = Module end clamp
J = Diagonal brace 50 x 50 x 5 mm; Material: Galvanised steel
1.2
Overview of required tools and auxiliary materials
Iron bars
Cordless screwdriver with torque limiter
Pencil
Inclinometer
Large angle approx. 2000 mm
Screw insert 6 mm
Ratchet with torque and socket wrench insert 19 mm
Summary of Contents for FRTSTV
Page 1: ...Installation Manual Art Nr FRTSTV Open Land System ISYS 1 1...
Page 6: ...5 1 2 Step 2 Ramming works A...
Page 7: ...6 2 1 Step 3 Installation of rafter profiles A B E F B A G Torque 100 Nm A2 A4 130 Nm HV...
Page 9: ...8 1 2 3 Step 5 Installation of purlins G B E F C G B C Torque 60 Nm...
Page 11: ...10 Click in Click in 1 2 3 4 Step 7 Installation of modules C I Torque 8 10 Nm...
Page 12: ...11...