background image

3

ROUGHING-IN AND DIMENSIONAL DRAWING

Summary of Contents for PCPEBF

Page 1: ...ESS BOTTLE FILLER Installation Instructions For UNFILTERED PCPEBF PCP10EBF PCPEBFY 230V PCP10EBFY 230V FILTERED PFCP10EBF OASIS International 222 East Campus View Blvd Columbus OH 43235 614 861 1350 w...

Page 2: ...ONNECTION INSTRUCTIONS 6 INSTALLATION 7 SET UP GUIDE FOR DISPENSER PCB ELECTRONICS 2 1 PRODUCT SPECIFICATIONS 1 PRODUCT SPECIFICATIONS 1 PRODUCT SPECIFICATIONS 1 PRODUCT SPECIFICATIONS Dimensions Dept...

Page 3: ...3 ROUGHING IN AND DIMENSIONAL DRAWING...

Page 4: ...S 2 IMPORTANT REQUIREMENTS 2 IMPORTANT REQUIREMENTS 2 IMPORTANT REQUIREMENTS 2 IMPORTANT REQUIREMENTS 4 BEFORE YOU START USING THIS WATER DISPENSER PLEASE READ THE FOLLOWING INSTRUCTIONS CAREFULLY The...

Page 5: ...NG STARTED 4 GETTING STARTED 4 GETTING STARTED 5 What s Included a CONTACTLESS BOTTLE FILLER b STABILIZER BRACKET c OPTIONAL VERSAFILTER III 5 VERSAFILTER III Filtered models only CONTACTLESS BOTTLE F...

Page 6: ...reduces its flow capacity and or stops it completely Fittings consist of two parts a body and a collet See figure below To install a tube push it through the collet until it seats firmly at the bottom...

Page 7: ...ter from the alcove filtered models only 2 Remove Front Panel by removing the 2 screws at the bottom of the panel on the sides See Diagram 1 and 2 6 INSTALLATION 6 INSTALLATION 6 INSTALLATION 6 INSTAL...

Page 8: ...f the cooler for shipping 3 Unpack the VersaFilter III and remove the sanitary cap 4 Looking at the filter top orient the filter so that the rectangular lug on top of the filter faces forward 5 Push t...

Page 9: ...t and feed 1 1 2 OD Drain Pipe through the hole See Diagram 4 5 6 INSTALLATION 6 INSTALLATION 6 INSTALLATION 6 INSTALLATION 9 DIAGRAM 4 Front View DIAGRAM 5 Rear View P Trap Located behind the filter...

Page 10: ...connect to quick connect fittings IMPORTANT Before connecting water supply to dispenser flush building water supply 8 Connect 1 1 2 OD drain pipe to Elbow Coupling not provided Connect to building dra...

Page 11: ...er in the alcove to activate water dispense The flow of water will be delayed until the filter fills with water Flush water through the system until the water becomes clear 12 Check system for any lea...

Page 12: ...are Bottle Count 0 5L 1 Bottle Flow Rate 1 2 GPM 20 second maximum dispense time To change the program settings follow these steps Top panel will need to be removed by taking out the two screws on ea...

Reviews: