2
Rim-To-Wall Installation
Position the unit in the bath area with the
rim edge against the wall framing. Check
for any framing modifications which may be
required to accommodate pipes or fittings
on whirlpool equipped models.
With the unit properly positioned, check for
the following items: (Illust. 1)
l
Confirm the pre-leveled base blocks are
resting flush on the floor
l
Confirm drain position.
l
Confirm the unit is level along each side
and across each end.
If required, place material under the base
blocks to maintain the unit in a level posi-
tion. After leveling the unit, place a mark
along the bottom edge of the unit rim at
each framing member. Remove the unit and
apply a 3/4” rail to the framing, 1/16” below
the rim mark on the framing (illust. 1). DO
NOT install the 3/4” rail as a rim support.
After repositioning and re-leveling the unit,
secure the base blocks to the floor by apply-
ing a bead of construction adhesive to the
underside of each block (illust. 2).
NOTE: Any material place under the base
blocks to keep the unit level must be
structurally sound and applied to ensure the
unit’s weight will be equally distributed over
the entire base.
Deck Surround Framing
With the unit secured to the floor struc-
ture, as shown in illustrations1 and 2, the
framework surrounding the unit can now be
constructed. Due to the design possibilities,
it is impossible to provide exact guidelines
for every type of installation.
The following guidelines apply to every
self-rimming unit regardless of the installa-
tion configuration. A careful review of these
guidelines before continuing is important in
avoiding unnecessary problems resulting in
an improper installation (illust. 3, 4, 5, & 6).
a) All materials and construction techniques
must comply with applicable codes for
the installation site.
b) All framing must be square, level, and
adequately designed to provide the
structural (weight bearing) support nec-
essary for the areas use.
c) Provide all acess areas required to com-
ply with applicable codes for the installa-
50-1/4”
9-3/4”
60”
16”
16”
2” Dia. Drain
32”
16-3/4“
4-1/4”
2-1/2” Dia. Overflow
7/8“ Drain
Clearance
Drain Center
Overflow Center
6“
21”
Arm Rest
Arm Rest
15-7/8“
Beveled Edge
Leveling Supports
2” Rim
19”
11” x 3”
Faucet Area
11” x 3” Faucet Area
Geneva 3260 / TR-B-200, TRG-200
50”
10”
60”
17-3/4”
18-1/4”
2” Dia. Drain
36”
16-3/4“
4-1/4”
2-1/2” Dia. Overflow
1“ Drain Clearance
Drain Center
Overflow Center
6-1/2“
2 Rim”
21”
Arm Rest
Arm Rest
15-3/4“
Beveled Edge
19”
15” x 3”
Faucet Area
15” x 3” Faucet Area
Geneva 3660 / TR-B-240, TRG-240
51-3/4”
8-1/2”
60-1/4”
15-5/8”
16-5/8”
2” Dia. Drain
32-1/4”
18“
3”
2-1/2” Dia. Overflow
2-1/4“ Drain
Clearance
Drain Center
Overflow Center
6“
21”
15-3/4“
Leveling Supports
19”
2” Rim
15” x 4”
Faucet Area
15” x 4” Faucet Area
San Salvador 1 / TR-B-100
51-7/8”
8-3/8”
60-1/4”
18”
18”
2” Dia. Drain
36”
18“
3”
2-1/2” Dia. Overflow
2-1/2“ Drain
Clearance
Drain Center
Overflow Center
5-3/4“
21”
15-1/2“
Leveling Supports
19”
2” Rim
15” x 4”
Faucet Area
15” x 4” Faucet Area
San Salvador 2 / TR-B-150
2” Dia. Drain
3”
2-1/2” Dia.
Overflow
2“ Drain
Clearance
Leveling Supports
2“ Rim
19”
30“
41-3/4”
12-3/8”
29-3/8”
18”
16”
59-5/8”
21”
29-5/8”
15” x 4”
Faucet Area
Paradise Isle / TR-B-900