7
- GB -
Correct electrical installation
−
Electrical installations must meet the national regulations and may only be carried out by a qualified electrician.
−
A person is regarded as a qualified electrician, if, due to his/her vocational education, knowledge and experience, he
or she is capable of and authorised to judge and carry out the work commissioned to him/her. Working as a qualified
person also includes the recognition of possible hazards and the adherence to the pertinent regional and national
standards, rules and regulations.
−
For your own safety, please consult a qualified electrician.
−
The unit may only be connected when the electrical data of the unit and the power supply coincide. The unit data is
to be found on the unit type plate or on the packaging, or in this manual.
−
Ensure that the unit is fused for a rated fault current of max. 30 mA by means of a fault current protection device.
−
Extension cables and power distributors (e.g. outlet strips) must be suitable for outdoor use.
−
Protect the plug connections from moisture.
Safe operation
−
The unit is not suitable for completely isolating the units connected to it.
−
Never operate the unit if either the electrical cables or the housing are defective!
−
Do not carry or pull the unit by its electrical cable.
−
Route all cables such that damage is excluded and nobody can trip over them.
−
Never open the unit housing or its attendant components, unless this is explicitly required in the operating instruc-
tions.
−
Only use original spare parts and accessories for the unit.
−
Never carry out technical modifications to the unit.
−
Only have repairs carried out by customer service points authorised by OASE.
Installation and connection
This is how to connect the power supply:
−
Insert the speed controller into the socket.
−
Observe the specified safety distance of the unit from the water (B).
−
Insert the plug of the pump connection cable into the speed controller.
Operation
How to operate the unit:
1
Button for switching the pump on and off, and for controlling it.
2
Status LED. The LED is lit when the unit is supplied with mains voltage.
Switching the pump on and off
Press the button
once briefly:
Pump is switched on or off.
−
When the pump is switched on, it is controlled at the most recently
saved speed value.
−
The current speed value is saved when the pump is switched off.
Controlling the pump (the pump is switched on)
Press and hold the
button down:
The speed value changes continuously. The fountain height/flow quantity
changes accordingly.
Release the button:
The current speed value is set/fixed.
Press and hold the
button down again:
The counting direction is changed and the speed value changes con-
tinuously.
Summary of Contents for InScenio Dimmer
Page 1: ...21691 08 H InScenio Dimmer 21691 GAW_InScenio_Dimmer_A5_end_ 09 08 12 10 29 Seite 2...
Page 2: ...2...
Page 26: ......
Page 27: ...21691 08H...