Electrical Troubleshooting Guide

Please use the following instructions to operate the barrier manually, the following
is assuming you have powered down the unit and opened the cabinet door:

Turnstile Maintenance

Manual Release

To Manually release the Turnstile, Turn the entry or exit key switch clockwise to release the

rotor into free wheel. The key switches are located underneath the main header just above the

rotor as illustrated below.

As stated at the beginning of this manual we recommend a bi-annual service, but at a bare minimum, it is imperative
that you get a service done once every 12 months. This is not a sales tactic in disguise, there is a very serious
health and safety issue/risk associated with not complying to this. Also in order for your equipment to keep
complying with the appropriate legislation.

Before carrying out any maintenance to the installation, Isolate the mains power supply.

Make sure you have disconnected/Isolated the power before attempting any work.

A Maintenance Contract should be sought from a specialist company after a maximum of 5000 manoeuvres or

1year from the install date.

Have a qualified technician (installer) check the correct setting of the electric clutch.

If the power supply cable is damaged, it must be replaced by the manufacturer or its technical assistance service,

or else by a suitably qualified person, in order to prevent any risk.

When any operational malfunction is found, and not resolved, disconnect the mains power supply and request the

assistance of a qualified technician (installer). When automation is out of order, activate the manual release to
allow the opening and closing operations to be carried out manually.

Bearing units are “sealed” for life and require no further lubrication.

D4150

D4150

Summary of Contents for D4150

Page 1: ...120 Rotor 100 Duty cycle Made in the Full Heig ht Turns tile D4150...

Page 2: ...cumentation Any other use not specified in this documentation could damage the productand be dangerous The Companydeclines all responsibility for any consequences resulting from improper use of the pr...

Page 3: ...l health arising from the movement of goods from supplier through haulier to the recipient and end user including any home deliveries The project will focus upon the delivery and collection of goods a...

Page 4: ...he Turnstile will either be on a Pallet or flat packed If flat packed then follow Step s 2 4 if already assembled carry on to step 5 Note please check for physical damage before You sign Turnstile Box...

Page 5: ...lastic caps on The bolts 8 You are ready now to connect up Mains supply And access control using the diagram on page 8 Once you have everything connected Check All connections are tight and correct Th...

Page 6: ...ineers Installing Commissioning Equipment Fitted Handover Date Part 2 Existing Installation Items not covered under warranty This certificate Installers Name On Behalf of Address Signature Date of Sig...

Page 7: ...mplying with the appropriate legislation Before carrying out any maintenance to the installation Isolate the mains power supply Make sure you have disconnected Isolated the power before attempting any...

Page 8: ...Connection Terminals Layout PLC 24VDC Power supply D4150...

Page 9: ...Connected to Operation when active I1 Normally Open Free wheel Free wheels in both directions I2 Normally Open Entry signal Allows one person through the entry of the turnstile I3 Normally Open Exit s...

Page 10: ...Top Cog Spring assist requires lubrication Lubricate both items Turnstile Rotor is tight Turnstile is out of square level check turnstile frame is all square level Turnstile Rotor is tight Bottom bea...