ASSEMBLY
STEP 5: INSTALLING THE PIPEWORK
•
Perform a general check before installing the pipes to
ensure all O-rings are in the correct place.
•
Start with the straight pipes (Fig. 4). Guide these in from
below through the holes in the cabinet, and then screw
tight in the overflow box (hand-tight, do not over-wind,
tool is not required). The pipe with the largest diameter
sits in the middle, the two narrower pipes are identical
and are fitted adjacent on the left and right.
•
Connect the angled PVC pipes for the return pump,
overflow and emergency overflow with the threaded
connections. The angled PVC pipe with the black valve is
positioned in the centre (Fig. 5 – 7).
11
EN
(Fig. 4)
(Fig. 5)
(Fig. 6)
(Fig. 7)
Summary of Contents for OPUS 300
Page 1: ...OPUS 300 INSTRUCTIONS...
Page 4: ...SAFETY INSTRUCTIONS 4 Fig 1...
Page 34: ...NOTES 34...
Page 35: ...NOTES 35 EN...