background image

~ 4 ~

~ 5 ~

STEP 1 : PANEL PREPARATION

1

PANEL EDGE

H

CAUTION :

1. Watch for sharp staples on boxes.
2. DO NOT STEP ON PANELS
3

. The manual will give a recommended   

    order to open boxes, it saves space and time.

  

2

H

!

Open Box 

VP1.

Install 

INSULATION  STRIP

 

(H)

  to  Back, 

Top,  and  Bottom  Panels. 

PUSH  IN 

FULLY!

I

nsert 

Cam  Pins 

(E)  by  hand  in 

BACK 

PANEL’S

  predrilled  holes  down  to 

TAB.

(May require some force)

 

CAUTION : DO NOT BREAK CAM PIN TABS!

 

 

 

   DO NOT HAMMER!

TAB

TAB

BACK PANEL

1

H

H

E

Summary of Contents for Koolspace 110

Page 1: ...ASSEMBLY OPERATION MANUAL 1 1 0 2 2 0 CELLAR nuvo ko o l s p ac e TM...

Page 2: ...with extremes of temperature and humidity Garages attics unfinished basements laundry rooms breezeways closets bedrooms or any unventilated room In other words these units must be installed in air con...

Page 3: ...G D H NOTE Hardware quantities for Model 220 are indicated in parenthesis Cam Cap x 20 x24 Hex Bolt x 14 Hex Wrench x 1 Cam x 20 x24 Cam Pin x 20 x24 Leg x 4 In Cooling Unit Box Hex Bolt Flange x 2 P...

Page 4: ...ill give a recommended order to open boxes it saves space and time 2 H Open Box VP1 Install INSULATION STRIP H to Back Top and Bottom Panels PUSH IN FULLY Insert Cam Pins E by hand in BACK PANEL S pre...

Page 5: ...amaging cam pins DO NOT BANG OR SLAP PANELS TOGETHER Insert Cam push all the way in under panel level may require some force and make sure Arrow points to outside edge use allen key provided or 3 phil...

Page 6: ...Pins and gently push together to avoid damaging cam pins CHECK PANEL ORIENTATION Insert Cam and make sure Arrow points to outside edge use allen key provided or 3 phillips screwdriver Start locking on...

Page 7: ...ur LEGS F into BASES fully in 3 Open Box VP3 Fasten one HINGE found in door box to the SIDE of the cabinet with Hexbolts B NOTE Fasten BASE to the BOTTOM of the cabinet FRONT BASE has to be set with B...

Page 8: ...SHELVES BOTTOM TOP PRESS Open box VP4 Hook SHELVES into hangers starting from the bottom of cabinet HINT CENTER SHELVES ON HANGERS 1 2 Snap SHELVES into hangers on one side Push the SHELVES down to sn...

Page 9: ...through bottom flange holes Make sure unit is level 1 G C NOTE If unit is operated according to specifications overflows will not occur Excess condensation is only caused by extreme conditions Unit wi...

Page 10: ...10 3 Insert LIGHT COVER to holes pre drilled on front edge of TOP panel STEP 6 LIGHT AND LIGHT COVER INSTALLATION 1 Plug cord to LIGHT 2 Insert LIGHT to LIGHT COVER...

Page 11: ...fore tightening the bolts and move cellar into place leaving 4 clearance all around cellar MAKE SURE CABINET IS AIRTIGHT Adjust the level by turning counter clockwise the LEGS F as needed Use a carpen...

Page 12: ...blink alternating with the temperature reading This function is disabled in the first 4 hours Cool Down period or after any reset for another 4 hours The unit will restart and continue the cooling and...

Page 13: ...be installed as directed Avoid placing bottles directly in front of the cooling unit s circulating fan for more uniform temperature in cabinet WARNING Bottles in black will be in the cold air stream...

Page 14: ...power supply operational Is the LED display functional Is there any evidence of shipping damage on the cooling unit or packaging materials Note that the unit has a 1 minute cautionary delay between pl...

Page 15: ...ically regular cleaning of the condensor coil and fans Also you must take steps to protect the unit from sudden power surges As with any sensitive electronic device your Koolspace unit may be damaged...

Page 16: ...Toll free 1 888 274 8813 www koolspace com 1 1 0 2 2 0 CELLAR nuvo ko o l s p ac e TM...

Reviews: