9.3 Adjusting the rails
The standard distance between the rails is 880 mm. It is possible to adjust the rails +/- 100 mm
(see datasheet). Lower the lift in the ratchets until there is no tractive power on the ropes.
• Lower the main lift in the ratchet.
• Remove the ramp and the roll-off safety device from the adjustable rail.
• Remove both covers of the crossbeam.
• Remove the screws and if necessary position supports under the rail.
• Adjust the rail.
• Tighten the screw.
• Mount the cover.
• Mount the ramp and the roll-off safety device.
• Raise the lift out of the ratchets.
9.4 Initiation
Before the initiation a security check must be carried out. Therefore use the form: First
security check.
If the lift is installed by a competent person, he or she has to perform the security check. If the
operator installs the lift by him or herself, he or she must instruct a competent person to perform
the security check.
The competent confirms the faultless function of the lift in the installation record and the form for
the security check and authorises the use of the lift.
Please send the completed installation record to the manufacturer after installation.
9.5 Displacement of the automotive lift
If the place of installation is to be changed, the new place has to be prepared according to the
regulations of the first installation. The change should be performed in accordance with the
following points:
• Remove the spring at the ratchet-strip.
• Lower the lift in the lowest position
• Loosen and remove the ratchet-strip. If necessary, pull back the ratchet manually.
• Remove the cover of the Oil tank and remove the oil.
• Raise the lift on a working height. Press the button „lifting“
• Lower the lift until the rails lay on the erection trestles.
• Disconnect the power supply.
• Disconnect the hydraulic hoses.
• Loosen and remove the dowels.
• Loosen and remove the screws of the crossbeam.
• Transport the automotive-lift to the its new location
• Install the lift in accordance with chapter 9 “Installation and Initiation”.
Use new masonry-bolts, the used bolts can not be used again.
A security check must be performed before reinitiating by a competent person. Use
form “Regular security check”
Summary of Contents for 4.65H
Page 9: ...Operating instructions and documentation 4 65H 4 65 plus 9 2 5 Declaration of conformity ...
Page 11: ...Operating instructions and documentation 4 65H 4 65 plus 11 3 3 Datasheet ...
Page 12: ...Operating instructions and documentation 4 65H 4 65 plus 12 ...
Page 36: ...Operating instructions and documentation 4 65H 4 65 plus 36 9 7 Position of the columns ...