5.
Make sure that the belt is perpendi-
cular to pipe axis.
6.
Turn the handle clockwise until level
B
and level
C
join together.
7.
ATTENTION
Check that the gap
between the saddle and the pipe is lo-
wer than 1 mm: only in this case proceed
with the welding on the pipe. Wait for
the cooling time indicated on the bar
code on the fitting.
8.
Remove the positioner by turning
counterclockwise the handle and ex-
tract the belt from the tightening clamp.
NUPI AMERICAS, Inc.
1511 Superior Way,
Houston - TX 77039 - U.S.A.
ph. +1 281 590 4471- fax +1 281 590 5268
Web Site: www.nupiamericas.com E-mail: [email protected]