background image

17

ENGLISH

Before installing the unit, carefully read the safety instruc-
tions at the beginning of this manual; in particular read how 
to set the unit in a STATE OF ZERO ENERGY and the 
PRELIMINARY OPERATIONS.

1)  Once the machine has been withdrawn from the 

packaging, follow the instructions given in the 
"GENERAL DELIVERY NOTES".

2)  Position the unit on a horizontal surface.

Arrange the accessories as follows:
3)  Insert the ring (b2) into the hollow in the filter holder.
4)  Insert one of the two filters (b3 or b4).
5)  Caution: danger of pollution.

Tank Model
6)  Open the hatch (11) and take out the reservoir (12).
7)  Especially the first time, wash the reservoir with soap 

and water. Fill the reservoir with water and make 
certain that the outside of the reservoir is dry.

8)  Return the reservoir (12) to its housing and close the 

hatch (11).

Model for Direct connection to the water mains
6)  Remove the tube from the hatch on the top part of the 

machine.

7)  Connect the shaped end of the Teflon tube to the 

union on the base of the machine.

8)  Connect the other end of the tube with the 1/8” union 

to the mains water supply.

9)  Make certain that the water drain tank (16) has been 

inserted.

10) Two types of cup support grills (15) are possible:

INSTALLATION

a) tall cups.

DANGER OF POLLUTION

b) normal cups.

Make certain that the cup support grill (15) is positioned 

squarely and is level.

11)  Make certain that the steam knob (8) is closed.
12)  Make certain that the two buttons (1 and 4) protrude 

and are not pressed.

13)  Make certain that the line voltage corresponds to the 

requirements indicated on the label.

14)  Only if the steam valve (8) is closed, buttons (1 and 4) 

are not pressed and the line voltage matches the label 
requirements, plug the unit into the power supply 
outlet.

15)  The preliminary operations have been completed and 

the machine is ready to be set up.

SETTING UP THE MACHINE

NOTE:  if the sequence indicated below does not take 

place, see the chapter entitled "TROUBLES-
HOOTING".

After having completed the preliminary operations:
1)  Make certain that the steam valve (8) is closed.
2)  Press the main switch (1) to turn on the unit; the 

machine automatically feeds water into the boiler (ini-
tial time: approximately 3 min), once the water has 
reached the set level, the units starts heating and the 
heating light goes on.

 

Note: the machine has an electronic level valve so it 
automatically feeds in water to the boiler as needed to 
restore the level.

 

N.B.: the machine safety system shuts down the 
machine after the pump has been running steadily 
for approximately 2 minutes (this prevents the 
pump from overheating). In this case, turn off 
themachine by pressing the main switch and then 
turn it on again.

 

While the unit is operating, the ON light (2) and the 
heating light (7) are both lit.

3)  Wait until the heating light (7) goes off, indicating that 

the water has reached the desired temperature.

4)  Note: if the water light (6) goes on, it means that the 

water reservoir (12) is empty or nearly empty.

5)  Note: remember that to obtain a good drink it is best to 

use the cup warming shelf (14) to keep the cups warm.

6)  At this point the machine has been set up and is ready 

to make coffee or produce steam.

NOTE: At the start of the day’s activities and in any case, 

if there are any pauses of more than 8 hours, 
then it is necessary to change 100% of the water 
in the circuits, using the relevant dispensers.

NOTE:  In case of use where service is continuous, make 

the above changes at least once a week.

Summary of Contents for OSCAR

Page 1: ...LIBRETTO ISTRUZIONI USER HANDBOOK MANUEL D INSTRUCTIONS GEBRAUCHANWEISUNGEN INSTRUCCIONES DE MANEJO ...

Page 2: ...tenance is needed One thing is certain Oscar will be the star of your bar Nuova Simonelli S p a The international mark of approvement certifies that all our machines have undergone severe tests and inspections International certification attests to the thorough testing and calibration of these machines MODELS OSCAR SPECIAL MODELS DIRECTCONNECTION GROSS WEIGHT NET WEIGHT N OF UNITS HEATING CAPACITY...

Page 3: ...13 SHIPPING AND HANDLING pag 15 CONTROL PANEL pag 16 INSTALLATION pag 17 preliminary operations pag 17 setting up the machine pag 17 START UP preparing a single cup of coffee pag 18 preparation of two cups of coffee pag 18 how to produce steam pag 18 SHUT DOWN pag 19 CLEANING pag 19 MAINTENANCE pag 19 TROUBLESHOOTING pag 20 DIAGRAM pag 51 ...

Page 4: ...ual in a safe place for further consultation After having removed the packaging make certain that the unit is not damaged in any way If you have any doubts do not use the unit and contact a professionally qualified person Always keep all packaging plastic bags poly styrene foam nails etc out of the reach of children as they are a potential source of dan ger and never loiter the environment with su...

Page 5: ...using original spare parts Non compliance with the above can compromise machine safety Upon installation the qualified electrician must arrange for an omnipolar switch as called for by the safety regulations in force when open the contacts must be 3 mm or more apart To prevent dangerous overheating it is advisa ble to fully extend the power supply cord Never block the intake and or heat dissipatio...

Page 6: ...nment and on the people s health and helps the recycling of the materials the machine is composed of The user s illegal disposal of the product implies the application of administra tive fines as stated in Law Decree n 22 1997 article 50 and followings of the Law Decree n 22 1997 MACHINE ID When communicating with the manufacturer Nuova Simonelli always cite the machine ID number The machine is tr...

Page 7: ...is being dispensed 6 Reservoir empty light When this light is on the water reservoir 12 needs to be refilled 7 Heating element light ON the heating element is functioning OFF the boiler has reached operating temperatu re or the machine is off 8 Steam knob Turn the knob and adjust the jet of steam 9 Delivery assembly attachment Filter holder housing b1 10 Moveable steam nozzle with insulated outlet...

Page 8: ...1 and 4 are not pressed and the line voltage matches the label requirements plug the unit into the power supply outlet 15 The preliminary operations have been completed and the machine is ready to be set up SETTING UP THE MACHINE NOTE if the sequence indicated below does not take place see the chapter entitled TROUBLES HOOTING After having completed the preliminary operations 1 Make certain that t...

Page 9: ...e cup 9 Once the desired level has been reached press but ton 4 to stop the flow and light 5 goes off 10 Note if the unit is to be used frequently the coffee can be left in the filter until the next serving If it is not used frequently empty out the filter and clean it 11 At this point you have finished preparing of a single cup of coffee PREPARING TWO CUPS OF COFFEE NOTE if the sequence indicated...

Page 10: ...asket on the dispenser assembly 9 9 Dispenser assembly 9 1 Cleaning the steam nozzle Use a cloth dipped in hot water and or a neutral detergent 2 Cleaning the filter and filter holder If necessary use a tool to pry the filter b3 b4 out of the filter holder b1 Rinse under a jet of water tap and dry If necessary use a small brush to clean out the filter 3 Cleaning the outside of the machine Never us...

Page 11: ... Clean coffee grinds away from the gasket see the section on cleaning Check the amount of coffee the measure must be filled level The machine is not hot is the heating element off The coffee has not been ground fine enough The coffee in the filter has not been pressed correctly The coffee is not fresh The water is not fresh The coffee has been ground too fine The coffee has been pressed too hard T...

Page 12: ...S interruttore generale main switch interrupteur général Hauptschalter interruptor general DS interruttore erogazione caffè coffee delivery switch interrupteur distribution café Kaffeeausgabeschalter interruptor erogación café DE elettrovalvola erogazione caffè coffee delivery electrovalve électrovanne distribution café Kaffeeausgabe Elektroventil electroválvula erogación caféù LE elettrovalvola a...

Page 13: ...ed To exit the programming mode switch off the machine using the I O button and then switch it on again Fig 1 Preinfusion on off To enter the programming mode switch on the machine using the I O button holding down the coffee button until the water presence light begins to flash Switch the preinfusion on off by pressing the coffee button When the light is on off the preinfusion mode is also on off...

Page 14: ...y Tel 39 0733 9501 Fax 39 0733 950242 www nuovasimonelli it E mail n simonelli nuovasimonelli it Graphics by X TYPE ENGINEERING S r l Codice 31000370 Ed 01 del 09 2009 Nuova Distribution Centre LLC 6940Salashan PKWY BLDG A 98248 Ferdale WA Tel 1 360 3662226 Fax 1 3603664015 videoconf 1 360 3188595 www nuovasimonelli it info nuovasimonelli com ...

Reviews: