Nucraft ALEV CLASSIC Installation Instructions Manual Download Page 10

Step 6: Level Frame

At this point use the glides on the bottom of the legs and the structural center column to level the frame. 

Summary of Contents for ALEV CLASSIC

Page 1: ...Alev Installation Instructions ID...

Page 2: ...e instruction thoroughly A minimum of 2 3 persons is required for this assembly Larger tables above 132 will need more people for multi section frame assembly These instructions reflect typical assemb...

Page 3: ...vided Hardware HW0747 Screw 10X 625 PH PHIL HW1093 Bolt 25 20X 75 HXF ZN SERR HW1094 Nut 25 20 HXF ZN SERR HW2248 Bolt 312 18X 625 SKT C S HW4640 Screw 12X1 PH PH TY 17 ZP HW8013 Screw 25 X 20X 315 TH...

Page 4: ...Alev Classic Segmented...

Page 5: ...e legs to the end frame sections Then attach end frames to middle frame sections Single Piece Frames Frame weldment attaches to legs with an internal key that aligns to the holes in both the frame and...

Page 6: ...ver the steel legs and rest in place These will be fastened later in the process Each end of the frame to be lifted in the air and slowly lowered down onto the wood leg 2 3 people will be needed for t...

Page 7: ...er center column This gets attached AFTER the shroud in step 4 non optional Tables over 132 in length have a structural center column Use bracket plates at top of column to fasten component to frame b...

Page 8: ...Step 4 Shroud Tables with power only Metal shroud fits on the underside of the frame by screwing in 4 8 thumb screws HW8013 to the frame beam...

Page 9: ...Column optional Tables under 132 in length have an optional wire management center column The column can be placed anywhere along the central beam structure Suggested location is centered Attach to f...

Page 10: ...Step 6 Level Frame At this point use the glides on the bottom of the legs and the structural center column to level the frame...

Page 11: ...sections into one of the end sections to align the parts On the underside of the tops add the tite joint fasteners in place Tightening them enough to hold but still allowing for adjustments of the to...

Page 12: ...ection of the top onto the frame in the general position they will end up being secured See labels on the sections for proper ordering Place plastic spline into the grooves on the edge of the sections...

Page 13: ...nderside of the top screw the leg plates to the work surface first keeping the wood leg top edge as flush to the work surface edge as possible Then follow with screwing the frame half moon plates to t...

Page 14: ...yourself so the ends of the apron tuck into the cutout in the legs Have one person hold apron in place to ensure the apron stays tucked into cutout while being secured by another person Use HW0747 to...

Page 15: ...k of the power units in the aprons through the mouse hole in the frame beam Once on the other side plug in the cords to the duplexes Then tuck the extra cordage into the shroud hidden from sight Wire...

Page 16: ...Power Matrix Use the separate installation instructions for the power matrix unit NOTE Alev specifically uses spacer plates between the metal pan and wood top to help flush the top of the power matri...

Page 17: ...Step 11B optional Surface Power Power Cap Set power cap in the cutout in the top Use provided bracket on the underside of top to hold power cap in place...

Reviews: