05. 11. 21. Document Number  671999

Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk

MRXBOXAB-ECO-LP2B

Installation Manual

3.5 ADF 2010 Ventilation Calculations Design of MVHR 
Systems

The MVHR system has been sized for the winter period. Additional 
ventilation may be required during the warmer months and it has 
been assumed that the provisions for purge ventilation (e.g. openable 
windows) could be used.

Step 1:

 For any design air permeability, determine the whole dwelling 

ventilation supply rate from

 Table 2.

As an alternative where the design air permeability is intended to be 
leakier than (>) 5m3/(h.m2) 50 Pa, allow for infiltration for all dwelling 
types by subtracting from the whole dwelling ventilation supply rate 
from Table 2; 0.04 x gross internal volume of the dwelling heated space 
(m3).

Step 2:

 Calculate the whole dwelling extract ventilation rate by 

summing the individual room rates for ‘minimum high rate’ from 

Table 

1.  

(For sanitary accommodation only, as an alternative, the purge 
ventilation provisions given in ADF 2010 can be used where security is 
not an issue. In this case ‘minimum high extract rate’ for the sanitary 
accommodation should be omitted from the step 2 calculation).

Step 3: 

The required airflow rates are as follows: 

The maximum whole dwelling extract ventilation rate (e.g. boost) 
should be at least the greater of step 1 and step 2.

Note that the maximum individual room extract rate should be at least 
those given in

 table 1 

for minimum high rate.

The minimum air supply rate should be at least the whole building 
ventilation rate found in step 1.

For Scotland refer to BRE Digest 398.

For further information refer to the “Domestic Ventilation Compliance 
Guide”.

3.6 Pre Commissioning MRXBOXAB MVHR Units

MRXBOXAB units are designed to ventilate the whole dwelling 
and must not be used during site construction or the clean-up 
period. Cement and plaster dust can be abrasive and can affect fan 
performance and reliability. Please ensure that the filters are checked 
prior to commissioning to ensure there is no build-up of dust or debris.

While the property is drying out, very high moisture levels are likely 
to occur. Therefore it is advisable that if the installation and building 
works are complete the unit is left running. If the building works are 
not complete please close the air valves or cover up the air valves to 
prevent condensation forming in the ductwork and the MRXBOXAB 
unit due to natural migration of warm air.

3.7 Dimensions (mm) - Standard Unit Configuration

700

View from top (A)

668 hole cent

res

View from control side

900 

37

1

857

885 hole centres 

121

End view

200

67

(B)

(A)

600 

Spigot 2.

View from underside with cover removed (B)

Air

Supply 

Spigot 3.

Extract 

Air

Spigot 4.

Air

Exhaust 

Spigot 1.

Air

250

Intake 

Heat 

exchanger

Bypass 

chamber

Supply

fan

Extract

fan

21.5mm condensate pipe

Drip tray 

Wire

frame

filter

Wire

frame

filter

Bypass 

4.

damper 

1.

2.

3

735 (Filter access distance)

Removable

access

filter

Removable

access

filter

69

97

342

Access 
Requirements

Unit Dimensions (mm) - Standard Unit Configuration

Summary of Contents for MRXBOXAB-ECO-LP2B

Page 1: ...supervision or instruction concerning the safe use of the appliance by a person responsible for their safety Children shall not play with the appliance Cleaning and user maintenance shall not be carr...

Page 2: ...r to be removed and provide sufficient access for maintenance such as filter change The fan must be installed indoors in a suitable ceiling void away from direct sources of frost heat water spray or m...

Page 3: ...r of bedrooms in dwelling 1 2 3 4 5 Whole dwelling ventilation rate l s 1 2 13 17 21 25 29 1 In addition the minimum ventilation rate should be no less than 0 3 l s per m2 of internal floor area This...

Page 4: ...be at least those given in table 1 for minimum high rate The minimum air supply rate should be at least the whole building ventilation rate found in step 1 For Scotland refer to BRE Digest 398 For fur...

Page 5: ...k Supply and extract ducts from external air bricks to the unit needs to be insulated Top of ceiling void Minimum distance as specified in Building Regulations Intake air from outside via air brick 3...

Page 6: ...on the same metal cable tray as other cables The electrical connection of the unit must be carried out by a qualified electrician The unit is supplied with a flexible cord for connection to the mains...

Page 7: ...2 Speed 1 Speed 2 14 Commissioning Controls 6 0 CONTROLS 6 1 Integral Automatic HX Bypass AB Units Only Intake and extract temperatures are monitored at the point the airflows enter the unit if the ra...

Page 8: ...al Sales office for further details Failure to maintain the unit as recommended will invalidate the warranty 9 0 END OF LIFE AND RECYCLING Where possible Nuaire use components which can be largely rec...