3.7 ADF 2010 Ventilation Calculations Design of MVHR 
Systems

The MVHR system has been sized for the winter period. Additional 

ventilation may be required during the warmer months and it has 

been assumed that the provisions for purge ventilation (e.g. openable 

windows) could be used.

Step 1: 

For any design air permeability, determine the whole dwelling 

ventilation supply rate from 

Whole Dwelling Ventilation Rates table.

As an alternative where the design air permeability is intended to be 

more than (>) 5m3/(h.m2) 50 Pa, allow for infiltration for all dwelling 

types by subtracting from the whole dwelling ventilation supply rate 

from Whole Dwelling Ventilation Rates table;

 0.04 x gross internal 

volume of the dwelling heated space (m3).

Step 2:

 Calculate the whole dwelling extract ventilation rate by 

summing the individual room rates for ‘minimum high rate’ 

from ADF 

2010 - Extract Ventilation Rates table.

(For sanitary accommodation only, as an alternative, the purge 

ventilation provisions given in ADF 2010 can be used where security is 

not an issue. In this case ‘minimum high extract rate’ for the sanitary 

accommodation should be omitted from the step 2 calculation).

Step 3:

 The required airflow rates are as follows:

The maximum whole dwelling extract ventilation rate (e.g. boost) 

should be at least the greater of step 1 and step 2. Note that the 

maximum individual room extract rate should be at least those 

given in 

ADF 2010 - Extract Ventilation Rates table.

The minimum air supply rate should be at least the whole building 

ventilation rate found in step 1.

For Scotland refer to BRE Digest 398.
For further information refer to “Domestic Ventilation Compliance 

Guide” www.planningportal.gov.uk/buildingregulations/approved 

documents/partl/compliance

3.7.1 Pre Commissioning MRXBOX MVHR Units

MRXBOX units are designed to ventilate the whole dwelling and must 
not be used during site construction or the clean-up period. Cement 
and plaster dust can be abrasive and can affect fan performance 
and reliability. Please ensure that the filters are checked prior to 
commissioning to ensure there is no build-up of dust or debris.

While the property is drying out, very high moisture levels are likely 
to occur. Therefore it is advisable that if the installation and building 
works are complete the unit is left running. If the building works are 
not complete please close the air valves or cover up the air valves to 
prevent condensation forming in the ductwork and the MRXBOX unit 
due to natural migration of warm air.

3.8 Dimensions

658

623

432

Side View

Front View

Top View

4 x 150mm dia.

Spigots 

458

16

120

226

226

Unit Weight

 

ECO3 = 24Kg 
ECO5 = 25Kg 

Mounting Bracket
(not to be used 
when unit is fitted in 
conjunction with 
MRXBOX-AV(3/5)  

12 

Unit Dimensions

Summary of Contents for MRXBOX-ECO3

Page 1: ...corporated within the fixed wiring and shall have a minimum contact separation of 3mm in accordance with latest edition of the wiring regulations This unit must be earthed Ducting must be securely fix...

Page 2: ...e appropriate authority and conforming to all statutory governing regulations All mains wiring must be in accordance with the current I E E Regulations or the appropriate standards Ensure that the mai...

Page 3: ...th centres of no more than 400mm Add additional vertical supports if necessary Height wise ideally the MDF panel should extend from floor to ceiling but as a minimum should be a least 2m high Fix the...

Page 4: ...mmodation 6 l s Whole Dwelling Ventilation Rates Number Of Bedrooms In Dwelling 1 2 3 4 5 Whole dwelling ventilation rate l s 1 2 13 17 21 25 29 Notes 1 In addition the minimum ventilation rate should...

Page 5: ...as follows The maximum whole dwelling extract ventilation rate e g boost should be at least the greater of step 1 and step 2 Note that the maximum individual room extract rate should be at least those...

Page 6: ...insulated Insulated supply duct Top of ceiling void Air supply to bedrooms in ceilings via Air Valve mounted unit Nuaire wall MVHR DRAIN Condensate drain uninsulated drain pipe with min 5o fall runnin...

Page 7: ...he two screws the Ecosmart cable can then be connected to the underside of the MVHR unit within The cable should be fed through rubber blanking plug to provide a seal when the cover is re fitted 4 3 W...

Page 8: ...s on the front cover The variants are listed below The display on the unit control panel will not indicate when a higher speed setting has been triggered by an external source such as an ES PIR2 etc 1...

Page 9: ...orrectly applied misused disassembled or not installed commissioned and maintained in accordance with the details contained in this manual and general good practice The product warranty applies to the...

Page 10: ...10 23 07 20 Document Number 671856 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOXAB ECO 3 5 OH SW Installation Manual NOTES...

Page 11: ...11 23 07 20 Document Number 671856 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOXAB ECO 3 5 OH SW Installation Manual NOTES...

Page 12: ...12 23 07 20 Document Number 671856 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOXAB ECO 3 5 OH SW Installation Manual NOTES...

Reviews: