MRXBOX(AB)-ECO3-AE

Installation Manual

3.7.1 Pre Commissioning MRXBOX MVHR Units

MRXBOX units are designed to ventilate the whole dwelling and must 
not be used during site construction or the clean-up period. Cement 
and plaster dust can be abrasive and can affect fan performance 
and reliability. Please ensure that the filters are checked prior to 
commissioning to ensure there is no build-up of dust or debris.

While the property is drying out, very high moisture levels are likely 
to occur. Therefore it is advisable that if the installation and building 
works are complete the unit is left running. If the building works are 
not complete please close the air valves or cover up the air valves to 
prevent condensation forming in the ductwork and the MRXBOX unit 
due to natural migration of warm air.

3.8 Dimensions

11 

Unit Dimensions

754

5

2

7

525

55

227 CR S

155

458 CR S

=

=

Ø150.0

UNIT WEIGHT = 56Kg

If ancillary distribution box (DB-ECO3) is to be used refer to documentation

supplied with DB-ECO3 for additional infomation as requirements will differ.

107

107

N

N)

Condensate drain 

connection

(opposite hand 

configuration)

Condensate drain connection

on centre line of unit

Condensate drain connection

(standard configuration)

Summary of Contents for MRXBOX-ECO3-AE

Page 1: ...lations This unit must be earthed Ducting must be securely fixed with screws to the spigot to prevent access to live parts Duct runs terminating close to the fan must be adequately protected by suitab...

Page 2: ...warmer months 1 2 3 Airflow Through unit Standard Unit Airflow Through OH unit Opposite Hand Unit Transport Fixings 3 0 MECHANICAL INSTALLATION Installation must be carried out by competent personnel...

Page 3: ...ceiling but as a minimum should be a least 2m high Fix the mounting bracket to the wall Figure 3 and use the wall mounted bracket to mount the unit on Figure 5 25 25 704 crs 9 1 dia 30 94 94 33 3 3 C...

Page 4: ...all other bedrooms This should be used as the default value If a greater level of occupancy is expected add 4 l s per occupant Any air intake terminal must be installed in accordance with the appropr...

Page 5: ...sture levels are likely to occur Therefore it is advisable that if the installation and building works are complete the unit is left running If the building works are not complete please close the air...

Page 6: ...sulated Insulated supply duct Top of ceiling void Air supply to bedrooms in ceilings via Air Valve mounted unit Nuaire wall MVHR DRAIN Condensate drain uninsulated drain pipe with min 5o fall running...

Page 7: ...Ecosmart Device Connector 4 1 Electrical Information Voltage 240V 1ph 50Hz Consumption 1 2 Amp This unit must be earthed The cable from the mains power supply should be connected to a fixed wiring ins...

Page 8: ...ed on to solely boost the unit Additional switch should be used local to the wet rooms Section 4 2 Humidity adjustment AB unit only Speed 2 Speed 1 Speed 2 Speed 1 18 19 Unit Control On Front Panel St...

Page 9: ...uired The serial number will be found on the identification plate attached to the unit casing Telephone 02920 858 400 aftersales nuaire co uk 6 3 Annually Thoroughly inspect the unit and its component...

Page 10: ...10 05 08 21 Document Number 671823 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOX AB ECO3 AE Installation Manual NOTES...

Page 11: ...11 05 08 21 Document Number 671823 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOX AB ECO3 AE Installation Manual NOTES...

Page 12: ...12 05 08 21 Document Number 671823 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOX AB ECO3 AE Installation Manual NOTES...

Reviews: