NuAire MRXBOX-ECO3-AE Installation Manual Download Page 4

4

05. 08. 21. Document Number  671823

Nuaire | 

Western Industrial Estate 

Caerphilly 

CF83 1NA 

|

 

nuaire.co.uk

MRXBOX(AB)-ECO3-AE

Installation Manual

3.4 Extract / Input Areas

The unit is designed to extract air from all wet rooms e.g. bathroom, 
kitchen, en-suite, utility room (with sink).  WC’s do not need to be 
ventilated if openable windows are fitted.

Supply air should be to all habitable rooms e.g. bedrooms and lounge. 
Extract / input grilles should be adjustable valve types (not supplied). 
External grilles are to have a minimum free area of 12,250 sq. mm.

3.5 Ducting

Before commencing ducting installation reference should be made 
to building regulations document “Domestic ventilation compliance 
guide”. This document supports ADF2010 and details installation, 
testing and commissioning of all ventilation systems.

It is recommended that rigid ducting be used at all times. Flexible 
ducting has a very high resistance and it is impossible to calculate how 
much resistance will be on a system if used.

If used the flexible ducting must be kept to a minimum and should 
always be pulled taut. A maximum of 300mm should be used on each 
leg.

To prevent condensation on the outside of the outside air inlet duct and 
the air outlet duct from the unit, these ducts should be insulated. 

Ducting must be installed in such a way that resistance to airflow is 
minimised. Bends should be kept to a minimum.

A minimum distance of 300mm between the appliance and any bends 
in ductwork is recommended.

Ideally 150mm diameter or 204 x 60mm rectangular ducting should be 
used (Figures 12 & 13).

Ducting joints must be sealed with silicone type sealant and shall be 
adequately and reliably fixed to the appliance.

3.6 Ventilation Flow Rates

ADF 2010 - Extract Ventilation Rates

Room

Minimum High rate

Minimum Low Rate

Kitchen

13 l/s

Total extract rate 

should be at least 

the whole dwelling 

ventilation rate given 

in table 2.

Utility Room

8 l/s

Bathroom

8 l/s

Sanitary 

Accommodation

6 l/s

Whole Dwelling Ventilation Rates 

Number Of Bedrooms In Dwelling

1

2

3

4

5

Whole dwelling 

ventilation rate 

(l/s)

1,2

13

17

21

25

29

Notes: 

1. In addition, the minimum ventilation rate should be no less than 0.3 

l/s per m² of internal floor area.  (This includes all floors, e.g. for a two-

story building add the ground and first floor areas).
2. This is based on two occupants in the main bedroom and a single 

occupant in all other bedrooms. This should be used as the default 

value. If a greater level of occupancy is expected add 4 l/s per occupant.

Any air intake terminal must be installed in accordance with the 
appropriate regulation. As a guide, the BS5440 series of British 
Standards deals with this issue and currently states that an air 
intake must be at a minimum distance of 300mm from a gas 
boiler balanced flue. Installers are advised to be aware of the 
requirements of this standard when installing ‘through the wall’ 
supply air ducting.

3.7 ADF 2010 Ventilation Calculations Design of MVHR 
Systems

The MVHR system has been sized for the winter period. Additional 

ventilation may be required during the warmer months and it has 

been assumed that the provisions for purge ventilation (e.g. openable 

windows) could be used.

Step 1: 

For any design air permeability, determine the whole dwelling 

ventilation supply rate from 

Whole Dwelling Ventilation Rates table.

As an alternative where the design air permeability is intended to be 

more than (>) 5m3/(h.m2) 50 Pa, allow for infiltration for all dwelling 

types by subtracting from the whole dwelling ventilation supply rate 

from Whole Dwelling Ventilation Rates table;

 0.04 x gross internal 

volume of the dwelling heated space (m3).

Step 2:

 Calculate the whole dwelling extract ventilation rate by 

summing the individual room rates for ‘minimum high rate’ 

from ADF 

2010 - Extract Ventilation Rates table.

(For sanitary accommodation only, as an alternative, the purge 

ventilation provisions given in ADF 2010 can be used where security is 

not an issue. In this case ‘minimum high extract rate’ for the sanitary 

accommodation should be omitted from the step 2 calculation).

Step 3:

 The required airflow rates are as follows:

The maximum whole dwelling extract ventilation rate (e.g. boost) 

should be at least the greater of step 1 and step 2. Note that the 

maximum individual room extract rate should be at least those 

given in 

ADF 2010 - Extract Ventilation Rates table.

The minimum air supply rate should be at least the whole building 

ventilation rate found in step 1.

For Scotland refer to BRE Digest 398.
For further information refer to “Domestic Ventilation Compliance 

Guide” www.planningportal.gov.uk/buildingregulations/approved 

documents/partl/compliance.

To SVP 

“T” piece 

MVHR Drain 

To unit 

To CONTRAP 

10 

"T" Piece CONTRAP & MVHR Drain Connection

When using a “T” Piece to connect the CONTRAP drainage and 
the MVHR drain pipework the MVHR drain must always be fitted 
before the “T” Piece to prevent condensate from feeding back into 

the MVHR system.

Summary of Contents for MRXBOX-ECO3-AE

Page 1: ...lations This unit must be earthed Ducting must be securely fixed with screws to the spigot to prevent access to live parts Duct runs terminating close to the fan must be adequately protected by suitab...

Page 2: ...warmer months 1 2 3 Airflow Through unit Standard Unit Airflow Through OH unit Opposite Hand Unit Transport Fixings 3 0 MECHANICAL INSTALLATION Installation must be carried out by competent personnel...

Page 3: ...ceiling but as a minimum should be a least 2m high Fix the mounting bracket to the wall Figure 3 and use the wall mounted bracket to mount the unit on Figure 5 25 25 704 crs 9 1 dia 30 94 94 33 3 3 C...

Page 4: ...all other bedrooms This should be used as the default value If a greater level of occupancy is expected add 4 l s per occupant Any air intake terminal must be installed in accordance with the appropr...

Page 5: ...sture levels are likely to occur Therefore it is advisable that if the installation and building works are complete the unit is left running If the building works are not complete please close the air...

Page 6: ...sulated Insulated supply duct Top of ceiling void Air supply to bedrooms in ceilings via Air Valve mounted unit Nuaire wall MVHR DRAIN Condensate drain uninsulated drain pipe with min 5o fall running...

Page 7: ...Ecosmart Device Connector 4 1 Electrical Information Voltage 240V 1ph 50Hz Consumption 1 2 Amp This unit must be earthed The cable from the mains power supply should be connected to a fixed wiring ins...

Page 8: ...ed on to solely boost the unit Additional switch should be used local to the wet rooms Section 4 2 Humidity adjustment AB unit only Speed 2 Speed 1 Speed 2 Speed 1 18 19 Unit Control On Front Panel St...

Page 9: ...uired The serial number will be found on the identification plate attached to the unit casing Telephone 02920 858 400 aftersales nuaire co uk 6 3 Annually Thoroughly inspect the unit and its component...

Page 10: ...10 05 08 21 Document Number 671823 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOX AB ECO3 AE Installation Manual NOTES...