NuAire HIAQM Installation Manual Download Page 2

2

16. 04. 21. Document Number  671965

Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk

HIAQM

Installation Manual

2.0 INTRODUCTION

The Haven IAQ Module range of ancillaries has been specially designed 
to complement the existing commercial range of XBC+ units as well as 
providing a general function of high grade filtration to any commercial 
ventilation units which require it. The unit shall be manufactured 
from Alu-zinc with double skin panels filled with insulation to provide 
thermal and acoustic barriers. The units will come as standard with 
pressure monitoring for the filtration and give a relay output for alarm 
signalling when a pre-determined pressure value is exceeded. The 
units will be available with different access options (Bottom or Side 
access) as well as weatherproofing and coastal varieties depending on 
installation location. The unit is unhanded with different operations 
to suit it for different installations available in this literature. Further 
information regarding performance and specifications for the 
equipment may be obtained from our technical literature, and/or 
project specific documentation. 

2.1 Code Description: 

1

-

2

-

3

-

4

-

5

-

6

7

HIAQM

-

015

-

S

-

A

-

A

-

1

W

   

1. Range:  

 

HIAQM  

= Haven Indoor Air   

 

 

 

 

Quality Filter Module

2. Reference Flowrate: 

015

  

= 0.15m

3

/s 

  

 

025  

= 0.26m

3

/s 

  

 

045

  

= 0.35m

3

/s 

  

 

055  

= 0.48m

3

/s 

  

 

065

  

= 0.58m

3

/s

3. Access Type: 

 

S  

= Side Access

 

 

  B 

 

= Bottom Access

4. Primary Stage Filter: 

A  

= G4 / ISO Coarse 

(Panel)  

B  

= M5 / PM10 50% 

  

 

C  

= M6 / PM2.5 50% 

  

 

D  

= F7 / PM1 50% 

  

 

E  

= F8 / PM1 70% 

  

 

F  

= F9 / PM1 80% 

  

 

H  

= No Filter

5. Secondary Stage Filter: 

A

  

= G4 / ISO Coarse 

(Bag)  

 

B

  

= M5 / PM10 50% 

  

 

= M6 / PM2.5 50% 

  

 

D

  

= F7 / PM1 50% 

  

 

E

  

= F8 / PM1 70% 

  

 

F

  

= F9 / PM1 80% 

  

 

G

  

= Rigid Carbon Panel Unit  

 

 

   (RCP)

6. Unit Finish: 

 

1  

= Standard 

  

 

4  

= Coastal 

(C4*)

7. Unit Roof:  

 

1  

= Standard Unit (No Roof) 

  

 

W  

= Twin Pitched Roof (Factory    

 

   Fitted)

* This units coastal finish has been designed to withstand an External 
C4 Atmospheric Corrosivity Category as per BS EN ISO 12944-2:2017 
providing that it is installed and maintained as per the manufacturer’s 
instructions and general Warranty Guidance Notes found in our 
conditions of sale. 

2.2 Dimensions & Weight

2.2.1 Standard Side Access Unit (e.g. HIAQM-015-S-A-A-11) 
 
 
 
 
 
 
 
 
 
 
 
 
 

Standard Side Access Unit Dimensions

2.2.2 Standard Bottom Access Unit (e.g. HIAQM-015-B-A-A-11)

 

Standard Bottom Access Unit Dimensions

Unit Size

Side / Bottom

Hanging 

Bracket

Flange 

Connector Length

Side 

Access 

Units

Bottom 

Access 

Unit

A

B

C

D

E

F

G

H

J

J

IAQM-015 890

665

259

755

690

351

218

1010

728

709

IAQM-025 990

809 339 855

830

481 298

1110

869

849

IAQM-045 990

885

399 855

907

536 358

1110

945

925

IAQM-055 990 1068 469 855 1090 592 428

1110

1128

1108

IAQM-065 890 1068 622

755 1090 592

578

1010

1128

1108

2.2.3 Twin Pitched Roof Unit (e.g. HIAQM-015-S-A-A-1W)

Twin Pitched Roof Unit Dimensions

Unit Size

Side / Bottom

Flange 

Connector

Length

Width

A

B

C

F

G

H

J

IAQM-015

902

695

334

351

218

1010

729

IAQM-025

1002

839

424

481

298

1110

870

IAQM-045

1002

915

489

536

358

1110

946

IAQM-055

1002

1098

574

592

428

1110

1129

IAQM-065

902

1098

727

592

578

1010

1129

Summary of Contents for HIAQM

Page 1: ...ely electrically isolated before any panels are removed Check mains supply and control connections REFER TO INSTRUCTION MANUAL Read and understand the installation and maintenance manual before installing operating or maintaining this product 1 2 Important Information This manual contains important information on the safe and appropriate assembly transport commissioning operation maintenance disas...

Page 2: ...age Filter A G4 ISO Coarse Panel B M5 PM10 50 C M6 PM2 5 50 D F7 PM1 50 E F8 PM1 70 F F9 PM1 80 H No Filter 5 Secondary Stage Filter A G4 ISO Coarse Bag B M5 PM10 50 C M6 PM2 5 50 D F7 PM1 50 E F8 PM1 70 F F9 PM1 80 G Rigid Carbon Panel Unit RCP 6 Unit Finish 1 Standard 4 Coastal C4 7 Unit Roof 1 Standard Unit No Roof W Twin Pitched Roof Factory Fitted This units coastal finish has been designed t...

Page 3: ...rd to access and maintenance requirements and the objective of minimising the system ductwork resistance The units are heavy and should be mounted using the fixing brackets supplied or other suitable methods of support The supporting structure must be assessed for structural suitability The recommended installation method is to use standard Unistrut channel secured to the slab steelwork above the ...

Page 4: ...e To aid in installation where IAQM units are to be close coupled to a matching size XBC unit the double Supply Extract flange connector of the XBC unit should be removed from the XBC and fitted to the IAQM unit s inlet along with the extract leg ducting The full assembly of IAQM unit XBC flange connector and extract ducting can then be raised and connected to the XBC unit For further details see ...

Page 5: ... carbon filter lifespans 4 2 Routine Maintenance Clean all areas of unit and treat any areas of corrosion Check all access doors for leakage and if necessary locks should be adjusted and any replacement gasket materials should be replaced as required 4 3 Every 3 Months Check filters and change clean if required failure to do so may impair the performance and energy efficiency of this unit 4 4 Annu...

Page 6: ...ed in energy from waste centres Remaining Items can be further segregated and processed in accordance with the zero waste hierarchy Please call After Sales Support for further information on items not listed above Ensure that Nuaire product is made safe from any electrical water refrigerant supplies before dismantling commences This work should only be undertaken by a qualified person in accordanc...

Page 7: ...7 16 04 21 Document Number 671965 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk HIAQM Installation Manual NOTES ...

Page 8: ...8 16 04 21 Document Number 671965 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk HIAQM Installation Manual NOTES ...

Reviews: