NuAire FLAT2000 L Installation Manual Download Page 8

8

16. 10. 20. Document Number  670901

Nuaire | 

Western Industrial Estate 

Caerphilly 

CF83 1NA 

|

 

nuaire.co.uk

FLAT2000 L/R

Installation Manual

NOTES

Summary of Contents for FLAT2000 L

Page 1: ...cturer its service agent or similarly qualified persons in order to avoid a hazard The replacement cord must be of the same technical specification as the original cord or greater Precautions must be taken to avoid the back flow of gases into the room from the open flue of gas or other fuel burning appliances This appliance should not be used by children or persons with reduced physical sensory or...

Page 2: ... unit is supplied arranged for LEFT HAND discharge of air The FLAT2000R unit is supplied arranged for RIGHT HAND discharge of air Whilst the installation of the unit may be achieved by a suitable craftsman the provision of the electrical supply and the connection of the unit to the mains must be carried out by a qualified electrician 3 0 MECHANICAL INSTALLATION Installation must be completed by co...

Page 3: ...oving the front cover fixed by two screws with the third also requiring removal of the deflector plate assembly Position the unit on the wall where it is to be mounted and mark through the feet Drill and plug the wall with suitable fixings Remove the PCB cover and feed the electrical supply cable through the grommet hole in the rear of the unit standard 1mm three core lighting cable is recommended...

Page 4: ... discharge grilles Any air intake terminal MUST be installed in accordance with the appropriate regulation As a guide the BS5440 series of British Standards deals with this issue and currently states that an air intake must be at a minimum distance of 300mm from a gas boiler balanced flue Installers are advised to be aware of the requirements of this standard when installing through the wall suppl...

Page 5: ...al boost when required Main connection block PCB cover 5 4 Remote BOOST Switch Wiring A remote BOOST switch is supplied and provides a BOOST speed facility for additional ventilation on demand E N L optional lamp N L mains 230V 50Hz fan unit 3 pole isolator fuse 3A remote BOOST switch supplied 3 12 Boost Switch Wiring Diagram 5 5 Smoke Alarm Automatic Shut Down If the unit is required to switch of...

Page 6: ...tly applied misused disassembled or not installed commissioned and maintained in accordance with the details contained in this manual and general good practice The product warranty applies to the UK mainland and in accordance with Clause 14 of our Conditions of Sale Customers purchasing from outside of the UK should contact Nuaire International Sales office for further details Failure to maintain ...

Page 7: ...in Fused spur fitted Y N Fused rating fitted Amp 1 2 5 6 DD MM YYYY 15 Unit With Cover Installed 16 Schematic Of Spigot Configurations Within last 12 months 12 24 months ago More than 24 months ago Unknown General condition Ductwork intact Casing damaged Ductwork damaged Clean Light contamination Heavy contamination Clean Light contamination Heavy contamination Operational Clean Light contaminatio...

Page 8: ...8 16 10 20 Document Number 670901 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk FLAT2000 L R Installation Manual NOTES ...

Reviews: