background image

6

10. 05. 17. Leaflet number 671174

To comply with EC Council Directives 2006/42/EC’ Machinery Directive 

and 20

1

4/

30

/E

U

 (EMC).

To be read in conjunction with the relevant Product Documentation (see 2.1)

1.0      GENERAL

1.1         The equipment referred to in this 

Declaration of Incorporation 

is supplied by 

           Nuaire to be assembled into a ventilation system which may or may not include 

           additional components.

           The entire system must be considered for safety purposes and it is the 

           responsibility of the installer to ensure that all of the equipment is installed in 

          compliance with the manufacturers recommendations and with due regard to 

          current legislation and codes of practice.

2.0     INFORMATION SUPPLIED WITH THE EQUIPMENT

2.1       Each item of equipment is supplied with a set of documentation which provides 

           the information required for the safe installation and maintenance of the 

           equipment. This may be in the form of a Data sheet and/or Installation and 

           Maintenance instruction.

2.2      Each unit has a rating plate attached to its outer casing.  The rating plate 

           provides essential data relating to the equipment such as serial number, unit 

           code and electrical data.  Any further data that may be required will be found 

           in the documentation. If any item is unclear or more information is required, 

           contact Nuaire.

2.3      Where warning labels or notices are attached to the unit the instructions given 

           must be adhered to.

3.0     TRANSPORTATION, HANDLING AND STORAGE

3.1       Care must be taken at all times to prevent damage to the equipment.  Note that 

           shock to the unit may result in the balance of the impeller being affected.  

3.2      When handling the equipment, care should be taken with corners and edges and 

           that the weight distribution within the unit is considered.  Lifting gear such as 

           slings or ropes must be arranged so as not to bear on the casing.

3.3      Equipment stored on site prior to installation should be protected from the 

           weather and steps taken to prevent ingress of contaminants.

4.0     OPERATIONAL LIMITS

4.1       It is important that the specified operational limits for the equipment are 

           adhered to e.g. operational air temperature, air borne contaminants and unit 

           orientation.

4.2     Where installation accessories are supplied with the specified equipment eg.  

           wall mounting brackets.  They are to be used to support the equipment only.  

           Other system components must have separate provision for support.

4.3     Flanges and connection spigots are  provided for the purpose of joining to 

           duct work systems.  They must not be used to support the ductwork.

5.0     INSTALLATION REQUIREMENTS

           In addition to the particular requirements given for the individual product, the 

           following general requirements should be noted.

5.1       Where access to any part of equipment which 

moves

, or can become 

electrically

          live

are not prevented by the equipment panels or by fixed installation detail 

           (eg ducting), then guarding to the appropriate standard must be fitted.

5.2     The electrical installation of the equipment must comply with the requirements 

           of the relevant local electrical safety regulations.

5.3     For EMC all control and sensor cables should not be placed within 50mm or on 

           the same metal cable tray as 230V switched live, lighting or power cables and 

          any cables not intended for use with this product.

6.0     COMMISSIONING REQUIREMENTS

6.1       General pre-commissioning checks relevant to safe operation consist of the 

           following: 

           Ensure that no foreign bodies are present within the fan or casing. 

           Check electrical safety.  e.g. Insulation and earthing.

           Check guarding of system.

           Check operation of  Isolators/Controls.

           Check fastenings for security.

6.2     Other commissioning requirements are given in the relevant product documentation.

7.0      OPERATIONAL REQUIREMENTS

7.1        Equipment access panels must be in place at all times during operation of the 

           unit, and must be secured with the original  fastenings.

7.2      If failure of the equipment occurs or is suspected then it should be taken out of 

           service until a competent person can effect repair or examination. (Note that 

           certain ranges of equipment are designed to detect and compensate for fan failure).

8.0     MAINTENANCE REQUIREMENTS

8.1       Specific maintenance requirements are given in the relevant product documentation.

8.2     It is important that the correct tools are used for the various tasks required.

8.3     If the access panels are to be removed for any reason the electrical supply to the 

           unit must be isolated.

8.4     A minium period of two minutes should be allowed after electrical disconnection 

           before access panels are removed.  This will allow the impeller to come to rest.

           

NB: Care should still be taken however since airflow generated at some 

           other point in the system can cause the impeller to “windmill”  even when 

           power is not present.

8.5     Care should be taken when removing and storing access panels in windy 

           conditions.

INFORMATION FOR SAFE INSTALLATION, OPERATION AND MAINTENANCE 

OF NUAIRE VENTILATION EQUIPMENT

DECLARATION OF INCORPORATION AND INFORMATION FOR SAFE INSTALLATION, 

OPERATION AND MAINTENANCE

We declare that the machinery named below is intended to be assembled

with  other  components  to  constitute  a  system  of  machinery.    All  parts 

except for moving parts requiring the correct installation of safety guards

comply  with  the  essential  requirements  of  the  Machinery  Directive. The

machinery  shall  not  be  put  into  service  until  the  system  has  been 

declared  to  be  in  conformity  with  the  provisions  of  the  EC  Machinery 

Directive.

Designation of machinery:              

ECOSMART AIRMOVER FAN

Machinery Types:                              

Supply and Extract Fan 

Relevant EC Council Directives:     

2006/42/EC (Machinery Directive)

Applied Harmonised Standards:   

BS EN ISO 12100, BS EN ISO 13857 

EN60204-1, BS EN ISO 9001

Applied National Standards:          

BS848 Parts 1, 2.2 and 5 

Note: All standards used were current and valid at the date of signature.

Signature of manufacture representatives:

Name:                                           Position:

Date:

1) C. Biggs

Technical Director

10. 12. 13

2) A. Jones

Manufacturing Director 

10. 12. 13

Summary of Contents for ECOSMART AIRMOVER

Page 1: ...atutory and governing regulations e g I E E CIBSE COHSE etc Units are suitable for internal use unless it has a optional outdoor cover Please refer to section 3 0 for outdoor weather cover details Prior to installation the impeller should be rotated by hand to check for smooth rotation and that no transit damage has occurred It is advisable to fit flexible connectors on either side of the fan unle...

Page 2: ... volt free contacts are not fused If these are used to power any external equipment the installer must provide adequate fusing or other protections These contacts are rated at 5A resistive 0 5A inductive Run connections These contacts are closed when the fan is running Fault connections No fault the contacts are closed Fault the contacts are opened this includes no power supply at the unit 4 4 Dat...

Page 3: ...mV and is measured at the fans terminal Ventilation mode Cooling mode Heating mode Local control 0 00 OFF trickle 0 25 Speed 1 0 50 0 75 1 00 Speed 2 1 50 1 75 2 00 Speed 3 2 50 2 75 3 00 Speed 4 3 50 3 75 4 00 Speed 5 4 50 4 75 5 00 Speed 6 5 50 5 75 6 00 Speed 7 6 50 6 75 7 00 Speed 8 7 50 7 75 8 00 Speed 9 8 50 8 75 9 00 Speed 10 9 50 9 75 10 00 Only available on relevant unit Enabling Sensors ...

Page 4: ... speed motors DOL starting on both speeds 3 phase units up to 3KW 3 phase units with matched frequency inverter 3 phase units 4KW and above Set up Commissioning Box 3 phase motors are connected directly to the Motor Terminal Box Observe the motor plate and connection details 3 phase two speed tap pam wound motors require a three contactor control 3 phase Dual wound motors require a two contactor c...

Page 5: ...rying out any work When ordering spare parts please quote the serial number of the unit and the ARC number of the purchase if possible This information will be available on the fan label 8 0 Warranty The Airmover has a 3 year warranty and Ecosmart Airmover has a 5 year warranty The warranty starts from the day of delivery and includes parts and labour for the first year The remaining years covers ...

Page 6: ...o the appropriate standard must be fitted 5 2 The electrical installation of the equipment must comply with the requirements of the relevant local electrical safety regulations 5 3 For EMC all control and sensor cables should not be placed within 50mm or on the same metal cable tray as 230V switched live lighting or power cables and any cables not intended for use with this product 6 0 COMMISSIONI...

Reviews: