Nuaire Group XBOXER-MICRO Installation And Maintenance Manual Download Page 6

The filters fitted inside the unit are protected with a 

plastic film. Prior to commissioning remove the covers

(fig 13), take off the film and replace.

Isolation - Before commencing work make sure that 

the unit, switched live and Nuaire control are 

electrically isolated from the mains supply and 

switched live supply. 

6

Leaflet Number 671597 January 2013

Installation and Maintenance

XBOXER-MICRO Mechanical Ventilation with Heat Recovery & Summer Bypass

Technical or commercial considerations may, from time to time, make it necessary to alter the design, performance and 

dimensions of equipment and the right is reserved to make such changes without prior notice.

Run On   Trickle   Boost   Trickle   Boost   Power  Fan

 

       

Failure

6.0 Commissioning

1. For the required air flow rates please refer to the design 

specification for the property, follow 2.4, or refer to building 

regulations ADF 2006/2010.

2. The unit is supplied with independent control for both normal 

and boost airflows. (see fig. 9). 

3. Correct commissioning is essential to ensure the ventilation 

air flowrates are met. It also ensures the unit is not over 

ventilating and causing excessive power consumption. 

4. Commissioning should be carried out in accordance with 

building regulations document “Domestic ventilation 

compliance guide”. A calibrated moving vane anemometer 

and hood will be required to carry out commissioning.

5. Adjustment valves should be locked in place to prevent 

further adjustment. 

6. Once commissioned the home owner / tenant should be 

informed that the unit should not be adjusted as it will have 

a detrimental effect on the indoor air quality and could result 

in condensation and mould growth. The label covering the 

control has an adhesive panel which should be removed post 

commissioning to prevent tampering.

Figure 9. PCB inside enclosure.  

7.0 Maintenance/Cleaning

We recommend that the two G3 fiters are inspected after 

6 months, and replaced every 12 to 18 months.

The filters can be removed from the unit by removing the two

filter cover plates on the bottom panel of the unit.

The filter can now be extracted by pulling the removal loop on

the edge of the filter. Once the filters have been inspected

return or replace them as necessary.

Inspect the heat exchanger every 5 years. Generally check 

for damage and security of components. Refit cover.

8.0 Replacement of Parts

Should any component need replacing Nuaire keep extensive

stocks for quick delivery. Ensure that the unit is electrically 

isolated, before carrying out any work.

Note: The supply cable must be replaced by an electrically 

competent person. 

When ordering spare parts, please quote the serial number 

of the unit and the ARC number of the purchase if possible.

(This information will be available on the fan label).

9.0 Warranty

The 5 year warranty starts from the day of delivery and

includes parts and labour for the first year and parts only for

the remaining 4 years. This warranty is conditional on planned

maintenance being undertaken

.

10.0 Service Enquiries

Nuaire can assist you in all aspects of service. Our service 

department will be happy to provide any assistance required, 

initially by telephone and If necessary arrange for an 

engineer to call.

Customer Services Department 

on 08705 002 555

Summary of Contents for XBOXER-MICRO

Page 1: ...e outside air reaches 200C when the outer air temperature returns below this level the unit returns to its original state Outside air supplied through the bypass is still being filtered so the air qua...

Page 2: ...les to have a minimum free area of 12 250 sq mm 2 3 Ducting Before commencing ducting installation reference should be made to building regulations document Domestic ventilation compliance guide This...

Page 3: ...months and it has been assumed that the provisions for purge ventilation e g openable windows could be used Step 1 For any design air permeability determine the whole dwelling ventilation supply rate...

Page 4: ...nsate pipe 457 250 502 83 155 106 81 122 99 122 150 122 257 1 3 2 4 1 3 2 4 1 3 2 4 4 1 3 0 Dimensions mm Figure 5 Also shows the working space required 4 0 Ducting arrangements Fig 6 Typical ducted a...

Page 5: ...ion of 3mm 1 2 Customer wiring Figure 8 For good EMC engineering practice any sensor cables or switched live cables should not be placed within 50mm of other cables or on the same metal cable tray as...

Page 6: ...it should not be adjusted as it will have a detrimental effect on the indoor air quality and could result in condensation and mould growth The label covering the control has an adhesive panel which sh...

Page 7: ...r use with this product 6 0 COMMISSIONING REQUIREMENTS 6 1 General pre commissioning checks relevant to safe operation consist of the following Ensure that no foreign bodies are present within the fan...

Page 8: ...8 Leaflet Number 671597 January 2013 Western Industrial Estate Caerphilly United Kingdom CF83 1NA T 029 2085 8200 F 029 2085 8300 E ahu nuaire co uk W www nuaire co uk...

Reviews: