Nuaire Group XBOXER-MICRO Installation And Maintenance Manual Download Page 5

  

TEMP

Connection t

o

 

Remo

te

 F

a

il 

Indicat

or Ref: 

MRXBO

X95LH-RFI

ECOSMART NET

24V 0V    SW

F

AN 1

F

AN 2

1       2     3

CUSTOMER SUPPLY

THERMOSTAT

WAX ACTUATOR 

FOR DAMPER

5

Leaflet Number 671597 January 2013

Installation and Maintenance

XBOXER-MICRO Mechanical Ventilation with Heat Recovery & Summer Bypass

Unit 

wiring 

  Customer 

wiring

E

N

L

3 Pole Isolator
(supplied by others)

Single Pole Volt 
Free Switch
(supplied by others)

Mains 
230V~50Hz
Supply

Disconnection from the supply
mains must be incorporated 
within the fixed wiring in 
accordance with the wiring 
regulations and shall have a 
minimum contact separation 
of 3mm.

1  

2

Customer wiring

Figure 8. 

For good EMC engineering practice, any sensor cables 

or switched live cables should not be 

placed within 50mm of other cables or on the same 

metal cable tray as other cables.

Figure 7.

5.0  Electrical Connection

Please note: the electrical connection of the unit must be be carried
out by a qualified electrician.

The unit is supplied with a flexible cord for connection to the mains
supply.

Electrical details:-

Voltage:

240V  1ph  50Hz

Consumption: 1.3 

Amp 

Fuse rating: 

3 Amp

NOTE This unit must be earthed.

The three core cable from the mains power supply should be 
connected to a fixed wiring installation, via a fused isolator, in
accordance with current IEE wiring regulations.

Note: Wiring for 
reference purposes
only, as the 
connections above 
are factory fitted.

Summary of Contents for XBOXER-MICRO

Page 1: ...e outside air reaches 200C when the outer air temperature returns below this level the unit returns to its original state Outside air supplied through the bypass is still being filtered so the air qua...

Page 2: ...les to have a minimum free area of 12 250 sq mm 2 3 Ducting Before commencing ducting installation reference should be made to building regulations document Domestic ventilation compliance guide This...

Page 3: ...months and it has been assumed that the provisions for purge ventilation e g openable windows could be used Step 1 For any design air permeability determine the whole dwelling ventilation supply rate...

Page 4: ...nsate pipe 457 250 502 83 155 106 81 122 99 122 150 122 257 1 3 2 4 1 3 2 4 1 3 2 4 4 1 3 0 Dimensions mm Figure 5 Also shows the working space required 4 0 Ducting arrangements Fig 6 Typical ducted a...

Page 5: ...ion of 3mm 1 2 Customer wiring Figure 8 For good EMC engineering practice any sensor cables or switched live cables should not be placed within 50mm of other cables or on the same metal cable tray as...

Page 6: ...it should not be adjusted as it will have a detrimental effect on the indoor air quality and could result in condensation and mould growth The label covering the control has an adhesive panel which sh...

Page 7: ...r use with this product 6 0 COMMISSIONING REQUIREMENTS 6 1 General pre commissioning checks relevant to safe operation consist of the following Ensure that no foreign bodies are present within the fan...

Page 8: ...8 Leaflet Number 671597 January 2013 Western Industrial Estate Caerphilly United Kingdom CF83 1NA T 029 2085 8200 F 029 2085 8300 E ahu nuaire co uk W www nuaire co uk...

Reviews: