Asphalt and concrete cutters
Operation manual
Page
20
issued 01/2017
6. MAINTENANCE SCHEDULE
This maintenance schedule contains only the most important operations. Besides of these operations, carry out maintenance and repairs of the machine
as necessary depending on the respective conditions of operation. Check also the engine operation manual.
WARNING:
Turn off the engine before any maintenance or repair activity.
Use genuine spare parts only. Use of non-original spare parts may lead to damage to the machine. The manufacturer will not honor any
warranty claim arising from such reason.
Item
Operation
Initial inspection
After 1st month or 20
hrs.
Every 3 months or 50
hrs.
Every 6 months or
100 hrs.
Engine oil
Inspection of oil level
DAILY
Exchange
Air filter
Inspection
Cleaning
(1)
Spark plug (gasoline
engines)
Inspection - cleaning
Cyclone filter
Cleanig
(3)
Filter bowl
Cleaning
Fuel hose
Inspection - Exchange
Every two years
Valve clearance
Inspection - adjustment
Every 12 months or 250 hrs. (2)
Fuel tank and strainer
Cleaning
Every 12 months or 300 hrs. (2)
Drive belt
Tensioning
1.
To be carried more often when operating in dusty environment!!!
2.
Such maintenance should be performed by service technicians NTC, respectively. authorized service according to engine type, especially
if the user does not have the proper tools and knowledge about these devices.
3.
In case the engine is equipped by cyclone filter.